Browse
Search
Agenda - 05-15-2001-9e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 05-15-2001
>
Agenda - 05-15-2001-9e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:03:02 PM
Creation date
8/29/2008 10:32:02 AM
Metadata
Fields
Template:
BOCC
Date
5/15/2001
Document Type
Agenda
Agenda Item
9e
Document Relationships
Minutes - 05-15-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
NS RES-2001-061 Resolution Establishing Rules and Regulations for the Operation of a Sewer Collection Treatment System to Serve the Efland Area
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />22 . <br />extension, the Barber & Ross extension and the Richmond Hi11s <br />extension. <br />NOW THEREFORE BE ZT RESOLVED by the Board of Orange County <br />Commissioners: <br />1. The Efland Area Sewer System overall system plan <br />boundary is confirmed and ratified to include Phase I West, <br />Phase I East, Phase IT and the system boundary extensions all as <br />shown on the Efland Area Sewer Overall System Plan map which is <br />an exhibit to this Resolution. <br />2. The overall. system plan design is the design for Phase <br />I West, Phase I East and Phase II per the Hazen and Sawyer <br />report together with the design approved by the Orange County <br />Board of Commissioners for the Hancor, Barber & Ross and <br />Richmond Hi11s extensions together with the temporary forcemain <br />connection for Lloyd's Car Wash (this connection is subject to <br />all of the terms and conditions of the October 1, 1956, <br />Resolution). <br />3. Land located within the overall system plan boundary <br />must also meet all zoning, subdivision, land use plan and <br />comprehensive plan regulations of Orange County or the Town of <br />Hillsborough, if applicable, to qualify for system extension as <br />provided in the Resolution Establishing Rules And Regulations <br />For The Operation Of A Sewer Collection Treatment System To <br />Serve The Efland Area Of Orange County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.