Orange County NC Website
15 <br />collecting agent of the County immediately so that <br />corrections, if any, can be made. The specific procedures <br />to be followed in the event a user believes there has been <br />a billing error are described in Article XTII. <br />B. Meters will be read and bi11s rendered <br />in accordance with the policies established by the County <br />and any agency with which the County may contract. The <br />County reserves the right to vary the dates or length of . <br />time covered by any statement, temporarily or permanently, <br />if necessary for the efficient operation of the System. <br />C. Statements for sewer service wi11 be <br />computed on the basis of the published rate schedule then <br />in effect. <br />D. <br />connection to the <br />described in the Se <br />E. <br />separately metered <br />account.' <br />Charges for sewer-service commence when <br />System is complete as prescribed and <br />ewer Easement and Agreement. <br />Each - sewer connection will be <br />and will be maa,ntained as a separate <br />F. Monthly statements will be mailed on ar <br />about the date the user's water meter is read, if there is <br />a meter, or the same date each month as determined by the <br />prided County's billing and collecting agent where there is no <br />3/1/88 _ <br />water meter. Payment is due when the statement for sewer <br />