Browse
Search
Agenda - 05-15-2001-9e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 05-15-2001
>
Agenda - 05-15-2001-9e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:03:02 PM
Creation date
8/29/2008 10:32:02 AM
Metadata
Fields
Template:
BOCC
Date
5/15/2001
Document Type
Agenda
Agenda Item
9e
Document Relationships
Minutes - 05-15-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
NS RES-2001-061 Resolution Establishing Rules and Regulations for the Operation of a Sewer Collection Treatment System to Serve the Efland Area
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br />collecting agent of the County immediately so that <br />corrections, if any, can be made. The specific procedures <br />to be followed in the event a user believes there has been <br />a billing error are described in Article XTII. <br />B. Meters will be read and bi11s rendered <br />in accordance with the policies established by the County <br />and any agency with which the County may contract. The <br />County reserves the right to vary the dates or length of . <br />time covered by any statement, temporarily or permanently, <br />if necessary for the efficient operation of the System. <br />C. Statements for sewer service wi11 be <br />computed on the basis of the published rate schedule then <br />in effect. <br />D. <br />connection to the <br />described in the Se <br />E. <br />separately metered <br />account.' <br />Charges for sewer-service commence when <br />System is complete as prescribed and <br />ewer Easement and Agreement. <br />Each - sewer connection will be <br />and will be maa,ntained as a separate <br />F. Monthly statements will be mailed on ar <br />about the date the user's water meter is read, if there is <br />a meter, or the same date each month as determined by the <br />prided County's billing and collecting agent where there is no <br />3/1/88 _ <br />water meter. Payment is due when the statement for sewer <br />
The URL can be used to link to this page
Your browser does not support the video tag.