Orange County NC Website
12 <br />with the overall System plan as adopted from time to time <br />by' Orange County. All such extensions must be approved by <br />the County Engineer. <br />B. Extension ;of the System to new <br />r -~ <br />Air~nded developments can only be .approved by the County Engineer if <br />3./1/88 <br />~~---------~~---~~ all zoning, subdivision, land use plan and comprehensive <br />plan regulations of Orange County or the Town ~of <br />Hillsborough, if applicable, are met. With respect to <br />subdivisions, the subdivision preliminary. plat must be - <br />approved by the County or the Town, if applicable, which <br />preliminary plat shall include approved preliminary plans <br />for the System extension. Planned development plans which <br />include System extensions must include approved preliminary <br />plans for the System extension. - <br />C. All System extensions must be <br />consistent with Goal 9.3 of the Orange County Land Use Plan <br />which goal "prohibit[s] the establishment of public water <br />and sewer services in the areas designated water quality <br />critical areas, except to address emergency situations" and <br />with any Water and Sewer Policy of the County adopted as <br />part of its Comprehensive Plan. <br />D. All System extensions shall be <br />installed according to and' in compliance with approved <br />plans. <br />