Orange County NC Website
x Are there negative side effects of the project? If it is likely to impact a racial minority, score low. <br />x Emissions reduced (0 to 2 pts): <br />x Consider quantity and location. <br />x Higher scores should go to emissions reduced within Orange County, instead of at a power plant, due to greater health <br />co-benefits. <br />x Efficient use of Funds (0 to 2 pts): <br />x What is the return on investment? <br />x Does this project build on successful existing programs or leverage other funding? <br />x Will this project help to generate other funds or support future grant funding? <br />x Time to complete (0 to 1 pt): <br />x Projects that can be completed or show clear deliverables within one year should score higher. <br />x Ease of understanding, visibility, and messaging (0 to 1 pt): <br />x Projects that are easier to explain to Orange County taxpayers should score higher. <br />x Likelihood of success (0 to 1 pt): <br />x Projects that are within the direct control of the County and which have minimal complexity should score higher. <br />Project Scoring Table: <br />Project <br />Cost <br />Estimate <br />Racial <br />Equity <br />(0 to 3 pts) <br />Emissions <br />Reduced <br />(0 to 2 pts) <br />Efficient <br />use of <br />Funds <br />(0 to 2 pts) <br />Time to <br />Complete <br />(0 to 1 pt): <br />Ease of <br />understand <br />ing and <br />messaging <br />(0 to 1 pt): <br />Likelihood <br />of success <br />(0 to 1 pt): Total Rank* <br />Supplemental <br />Weatherization for Low <br />Income Households <br />$150,000 <br />Rooftop solar - OCS $160,000 <br />Rooftop solar - CHCCS $160,000 <br />Small hydropower feasibility <br />study $30,000 <br />Total <br />(Max for 2019-20 is <br />$470,000) <br />$500,000 <br />*All projects, including those that tie in their scoring and those that exceed the FY20 funding limit will be placed in rank order by CFE voting. <br />Project descriptions: <br />$WWDFKPHQW