Orange County NC Website
Revised 11/19 <br /> <br />ORANGE COUNTY <br /> CHANGE ORDER REQUEST <br />NORTH CAROLINA <br /> <br />______________________________________________________________________________________________________________ <br />Date: 1/30/2020 Project: Dickson House, Norwood Law office, doctors office, public restrooms Roofing repairs <br /> Change Order No. 1 (Existing PO 2000985) Department: AMS Department Address: 300 W. Tryon St, Hillsborough, NC <br />27278 Project: Roof Repairs 61310035-882000-30002 Contractor: Pickard Roofing Company, Inc Contractor Address: <br />823 East Trinity Ave, Durham, NC 27702 Effective date of original contract: 1/13/2020 <br /> <br />This change order increases decreases the contract time by days. Check here if no impact to contract time . <br /> <br />Will this change order impact the date of substantial completion? Yes No. If yes, the amended date of substantial <br />completion is: N/A <br />_______________________________________________________________________________________________________________ <br /> <br />Full Description of Change: This change request is to add a cedar breather under the new shakes to provide a better lifetime of the new <br />roof section. This also changes the “Heavy (3/4” butt) Treated certified cedar shake” to “Medium 18”x5/8” Medium #1 Tapersawn <br />shakes CCA treated “ An overall inspection of the roofs of all above mentioned buildings will be performed, and any loose, broken <br />and/or missing shingles will be replaced as necessary. <br /> <br />Reason for Change: After reviewing the current proposal and reviewing the longivity of the existing system it was determined that a <br />breather was needed in order to prolong the lifetime of the new cedar shakes. The sizes changed after a closer inspection was <br />completed to match existing shingles exact. <br />_______________________________________________________________________________________________________________ <br /> <br />Original contract sum: $ 36,161.00 <br /> <br />Contract sum prior to this change order: $ 36,161.00 <br /> <br />Amount of this change order: $ 4,794.00 <br /> <br />Total sum of the contract including this change order: $ 40,955.00 <br /> <br />_______________________________________________________________________________________________________________ <br />This change order is executed to amend the contract time and/or contract sum. It shall not be construed to impact the original contract, <br />project, services, or work in any other manner. All other terms of the Original Contract remain in effect. <br />Approved and executed this 3rd day of February, 2020. <br />_______________________________ _____________________________ _____________________________ <br />Contractor Owner Architect (when retained) <br /> <br />By:____________________________ By:___________________________ By:___________________________ <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: A4033B2B-5D76-4572-B0AA-A2F79ED9F29F <br /> <br /> <br /> <br /> <br /> <br /><br />