Browse
Search
2020-068-E AMS - Sasser Companies ES panel install contract amendment
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-068-E AMS - Sasser Companies ES panel install contract amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 10:32:34 AM
Creation date
2/3/2020 10:19:05 AM
Metadata
Fields
Template:
Contract
Date
1/28/2020
Contract Starting Date
3/20/2019
Contract Document Type
Contract Amendment
Amount
$6,835.00
Document Relationships
2019-193-E AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2020-068 AMS - Sasser Companies ES panel install contract amendment
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 12/18 <br /> <br />ORANGE COUNTY <br /> CHANGE ORDER REQUEST <br />NORTH CAROLINA <br /> <br />______________________________________________________________________________________________________________ <br />Date: 1/28/2020 Project: Phillip Nick Waters Emergency Services Building - Roof, Lights, Plumbing Change Order <br />No. 05 Department: AMS Department Address: 131 W. Margaret Lane, HIllsborough, NC 27278 Project: Emergency <br />Services Remediation Contractor: Sasser Companies, Inc Contractor Address: PO Box 10, Whittsett, NC 27377 <br /> Effective date of original contract: 3/20/2019 <br /> <br />This change order increases decreases the contract time by 0 days. Check here if no impact to contract time . <br /> <br />Will this change order impact the date of substantial completion? Yes No. If yes, the amended date of substantial <br />completion is: <br />_______________________________________________________________________________________________________________ <br /> <br />Full Description of Change: This change request includes the following: <br />This work is required to complete the installation of a new 3 phase panel at the Orange County Emergency Operation Center. This <br />includes removal existing 400 amp 1/0 phase electrical service. Furnishing and installing 400 amp 3/0 phase main breaker 42 circuit <br />Nema 3R electrical panel. Removal of existing 400 1/0 phase meter base. Furnishing and installing 400 amp 3/0 phase meter base. <br />Disconnect existing conduits and wiring from panel. Remove existing conduits and wiring from meter base to electrical panel. Electrical <br />Reconnect all conduits and wiring required for new electrical panel and meter base. <br /> <br /> <br />Reason for Change: During the electrical connection portion of the HVAC equipment it was discovered that the existing 2nd meter and <br />Power Panel #2 was only a single phase. During further investigation it was discovered that the wire from the transformer to the meter <br />was three phase wiring, but not connected at the transformer leg, and the existing meter would not support the third leg. Therefore this <br />change is required to provide power to a portion of the new HVAC equipment. <br />_______________________________________________________________________________________________________________ <br /> <br />Original contract sum: $ 1,499,409.00 <br /> <br />Contract sum prior to this change order: $ 2.416.223.12 <br /> <br />Amount of this change order: $ 6,835.50 <br /> <br />Total sum of the contract including this change order: $ 2,423,058.62 <br /> <br />_______________________________________________________________________________________________________________ <br />This change order is executed to amend the contract time and/or contract sum. It shall not be construed to impact the original contract, <br />project, services, or work in any other manner. <br />Approved and executed this 30th day of January, 2020. <br />_______________________________ _____________________________ _____________________________ <br />Contractor Owner Architect (when retained) <br /> <br />By:____________________________ By:___________________________ By:___________________________ <br />DocuSign Envelope ID: 3221A054-42DA-4F49-9D5E-52E5C799279E <br /> <br /> <br /> <br /> <br /> ! <br /> <br /><br />!
The URL can be used to link to this page
Your browser does not support the video tag.