Orange County NC Website
23 <br /> Dollar Thresholds in North Carolina <br /> Public Contracting statutes 0JIvOFDollu Ilmfts and statutory autftortty current as of November 1,2015 <br /> FormM Mddhq (estinotedcost ofawroct) <br /> Construction or repair contracts $S00,000 and above G-S.143-129 <br /> Purdhaw of apparatus,supplies,materials,and equipment S90,000 and above G5.143-129 <br /> Infortnal bidding ( um9costafrnntract) <br /> Construction Of repair contracts $30,000 to formal unit GS.143-131 <br /> Purchase of apparatus,supplies,materials,and equiprr.ent $30,000 to formal limit GS 143-131 <br /> Constructlort methods authorized for building projects Over$300,000 GS 143-128(a1; <br /> Separate Prime festmatedcost ofproyect) <br /> Single Prime <br /> Dual Bidding <br /> Construction Management at Risk iGS.143-128.1) <br /> Design-Build and Design-$wild Bridging(ES 143-128.1A;G.S.143-128,18) <br /> Public Private Partnership(P3)(G-S. 14342R iQ <br /> Historically Underutilized Business(HUB)requirements <br /> Budding construction or repair projects <br /> —Projects with state funding kyA mole 10%godreiquire:0 $100,000 ormore G.5.143.128.2(a) <br /> —Locally funded projects domed NUB requirements) S300,000 ornsore GS 143-128-20) <br /> --Projects in informal bidding range(nforrrwl HUB requirwwnts) $30,000 to$500,0D0' GS 143.131(b) <br /> 'Note Format HA,®requirements shardd be used for AnibmuRy bid prgletits o%MV betwem S.MOWand SSOtf,00b <br /> Um t on use of own forces(Force account work] (not to ezceeO G5.743-13S <br /> Construction or repair projects SS0 OW(total profectCost)ait <br /> $200,000(krbaro*cost) <br /> Bid bond or deposit <br /> Construction or repair contracts(at least 5%o(bidarrrount) Forma)bids(S50R,0W and above) G_5.143-129(b) <br /> Purchase contracts Not required <br /> Per fonnanaefPsyntent bonds <br /> Construction or repair contracts(100%dcantruct omount) Each contract over$50,000 of G.S.143-129(cl; <br /> project costing over S300,DD0 G_S.44A-26 <br /> Purchase contacts Not required <br /> General contractor's license required 53 AO and above GS.87-1 <br /> Exemption Force account work(see above) <br /> Owner-builder affidavit requirea Force account work(see abowl G.5.87-14M1I <br /> Use of licensed archltect or engineer required <br /> Nonstructural work $300,000 and above GS 133.1.1(a) <br /> Structural repair,additions or new construction $13S,000"above <br /> Repair work affecting We safety systems S100,000 and above <br /> S@lectbn of ar Mtect,engineer,surv@M,eonshucflon manager at rbk,or ded"Ild contractor <br /> 'Qualification-Based Selection'procedure(QBS) Al contracts uniesseartvpted G_S.143-64,31 <br /> Exemption authorized Only projects where estimated G5-14344.32 <br /> flee is less than S50,000 <br /> From A Lego f Guide to Aadvamig and Controc oN for North Cam&x Local Gownrnents end ed.,by Frayda S.Bluestein, <br /> a 2w4 by the Sdrool of Government,The University of North[aroma at Chapel Hill AD n is reserved. <br /> 11 <br />