Orange County NC Website
1; <br />:-~ <br />.t <br />MEMO T0: Tina Moon <br />FROM: S. D. Dixon <br />DATE: 11-16-00 <br /> <br />Per your request, a review of the above mentioned subject has been completed by <br />the NCDOT Graham District. Below for your file is a list of our recommendation <br />and comments for the subject: - . <br />1. Prior to•any construction of any new access. or alteration of any existing ac <br />within the right of way, the .developer/owner is required to .secure a permit <br />this office. It is the responsibility of the owner/developer to obtain a pe <br />2. All utilities located within the right of way shall require an encroachment <br />agreement. All services shall be flush with finished grade. Any utility ma <br />service car-nection or lateral located within the dedicated right of way steal <br />be maintained by the appropriate utility authority. <br />3. Any area w~.thin the State's right of way and/or easements disturbed during t <br />construction and/or maintenance shall be repaired to the satisfaction of .the <br />District Engineer or his representative., <br /> <br />