Browse
Search
Agenda - 02-04-20 5-a - Amendment of the Master Telecommunication Plan Map (MTP)
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 02-04-20 Business Meeting
>
Agenda - 02-04-20 5-a - Amendment of the Master Telecommunication Plan Map (MTP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 2:34:01 PM
Creation date
1/30/2020 2:24:11 PM
Metadata
Fields
Template:
BOCC
Date
2/4/2020
Meeting Type
Business
Document Type
Agenda
Document Relationships
Agenda - 02-04-20 Business Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2020\Agenda - 02-04-20 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> ADMINISTRATIVE APPROVAL OF TELECOMMUNICATION FACILITIES: <br /> Per Section 5.10.6 (A) of the UDO, under certain circumstances telecommunication facilities <br /> may be approved administratively by staff (i.e. no action by either the Board of Adjustment <br /> or BOCC) including: <br /> • Any wireless support structure less than 200 feet in height located on property that is <br /> owned or leased by Orange County, and <br /> • Any wireless support structure less than 200 feet in height on which the owner of <br /> such facility permits the County to collocate its wireless facilities on the structure at no <br /> charge to the County when the location of such facility is of benefit to the County as <br /> determined in the sole discretion of the County. <br /> Telecommunication facilities approved consistent with the provisions of Section 5.10.6 <br /> are still required to demonstrate compliance with the provisions of Section 5.10.8 of the <br /> UDO. Further a neighborhood information meeting and balloon test are required for all <br /> administratively approved new telecommunication facilities. <br /> Per Section 5.10.8 (A) (3) of the UDO, all telecommunication facilities subject to <br /> administrative review and approval are evaluated consistent with the following <br /> standards: <br /> (a) A proposed tower shall not be permitted if it is not substantially <br /> necessary for the telecommunications service need identified pursuant to <br /> the standards of this Ordinance. <br /> (b) Tower height shall be measured from the base of the tower to the <br /> highest point of the proposed antenna(s), with lightening rod, to be located <br /> atop the tower structure. <br /> (c) Telecommunications towers shall conform with all of the requirements <br /> of this Ordinance. <br /> (d) All towers shall be engineered to allow for collocations. No co-locator <br /> shall be refused access for collocation by charging exorbitant lease fees. <br /> Public safety provider collocations shall take priority over other co- <br /> locators. <br /> (e) A telecommunications consultant shall provide Planning Staff <br /> assistance on exorbitant rate leases. <br /> (f) All wireless support structures shall satisfy all applicable public safety, <br /> land use, or zoning issues required in this Ordinance, including aesthetics, <br /> landscaping, land-use based location priorities, structural design, <br /> setbacks, and fall zones. <br /> (g) Applicants shall evaluate the reasonable feasibility of collocating new <br /> antennas and equipment on an existing structure or structures within the <br /> applicant's search ring. <br />
The URL can be used to link to this page
Your browser does not support the video tag.