Browse
Search
2020-032-E AMS - Racanelli Construction epoxy flooring drain
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-032-E AMS - Racanelli Construction epoxy flooring drain
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:08:55 AM
Creation date
1/21/2020 10:35:14 AM
Metadata
Fields
Template:
Contract
Date
1/15/2020
Contract Starting Date
1/15/2020
Contract Ending Date
2/14/2020
Contract Document Type
Contract
Amount
$4,997.00
Document Relationships
R 2020-032 AMS - Racanelli Construction epoxy flooring drain
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: BOOE2CO3-7FB1-43E1-B462-15595673B8DC mood and Ag Freezer <br /> Racanelli Change Order Request <br /> Racanelli Construction South, Inc. Proposal and Pricing Summary <br /> 1001 Pemberton Hill Road,Suite 202 RCS Project#19-008 <br /> Apex,NC 27502 Date: 1/7/2020 <br /> Submitted To: <br /> Orange County <br /> 131 West Margeret Lane COR#3 <br /> Hillsborough, NC 27278 <br /> Attention : Angel Barnes via email <br /> Per RCS PCO#3 dated 1/7/20, we are pleased to provide the following proposal to install epoxy flooring to match <br /> existing in finish and thickness where the exterior walls were removed for the new freezer door openings. <br /> Labor Material <br /> Unit Unit Sub Unit Labor Material subcontractor <br /> Item Qty Unit Price Price Price Total Total Total Total <br /> 1 Blair Duron Restoration,LLC(See attached) 1 LS $ 2,586.00 $ 2,586.00 $ 2,586.00 <br /> Racanelli:Patch/repair existing wall damage <br /> between new door openings to allow for <br /> 2 epoxy cove base installation and repair. 4 MH $ 30.63 $122.521 $ 122.52 <br /> Subtotals J$122.52 $0 $ 2,586.00 $ 2,708.52 <br /> Small Tools&Consumables @ 5% on $ 122.52 $ 6.13 <br /> General Conditions $ - <br /> Labor Burden 38% on $ 122.52 $ 46.56 <br /> Sales Tax on Materials 7.50% on $ - <br /> Racanelli Construction South Overhead @ 10% on $ 2,761.21 $ 276.12 <br /> Racanelli Construction South Profit @ 5% on $ 3,037.33 $ 151.87 <br /> Insurance Premium @ 1.35% on $ 3,189.20 $ 43.05 <br /> TOTAL AMOUNT OF CHANGE ORDER REQUEST <br /> TOTAL TIME(CALENDAR DAYS)REQUESTED FOR THIS CHANGE <br /> Change Order Request accepted and authorized for contract Change Order <br /> Authorized By Architect: Date: <br /> Authorized By Owner: Date: <br /> cc: SD/file <br /> Notes: 1.)We reserve the right to claim additional cost and time extensions associated with this COR at a later time.2.)The epoxy color <br /> selection will be matched to the existing as closely as possible, however it will most likely not be a perfect match and look like a patch.3.) <br /> This COR includes 4"epoxy cove base to match existing at jamb returns and existing damages immediately adjacent to the new openings. <br /> We Have been authorized to proceed with this work. By: Scott W.prebttl2o <br /> This Proposal may be withdrawn from us if not accepted within 15 Days. Vice President <br />
The URL can be used to link to this page
Your browser does not support the video tag.