Browse
Search
2020-032-E AMS - Racanelli Construction epoxy flooring drain
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-032-E AMS - Racanelli Construction epoxy flooring drain
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:08:55 AM
Creation date
1/21/2020 10:35:14 AM
Metadata
Fields
Template:
Contract
Date
1/15/2020
Contract Starting Date
1/15/2020
Contract Ending Date
2/14/2020
Contract Document Type
Contract
Amount
$4,997.00
Document Relationships
R 2020-032 AMS - Racanelli Construction epoxy flooring drain
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: BOOE2CO3-7FB1-43E1-B462-15595673B8DC <br /> Racanelli Construction South, Inc. Potential Chang e <br /> Racanelli 1001 Pemberton Hill Road, Suite 202 <br /> Apex, NC 27502 Order (PCO) <br /> SUBMITTED TO: Piedmont Food and Ag Freezer <br /> Orange County <br /> 131 West Margaret Lane RCS PROJECT NO.# <br /> Hillsborough, NC 27278 19-008 PCO#2 <br /> ATTN;Angel Barnes PCO STATUS PCO. ISSUE DATE <br /> 1 11/11/19 <br /> DESCRIPTION OF CHANGE: <br /> Per on-site request of Orange County 11/5/19: <br /> • Racanelli to look at pricing to install drainage underground between dock and <br /> new pad and daylight out to the wooded area northeast of building. <br /> ® DOCUMENTS ARE ENCLOSED. <br /> SUBCONTRACTOR/SUPPLIER DISTRIBUTION: <br /> STATUS: <br /> 1 ® Price quotations are requested within 3 working days from the date of this Potential Change Order. No work is <br /> authorized until proposals are accepted and written authorization is given to proceed. <br /> 2 ❑ All concerned are authorized to proceed with the work of this Potential Change Order. Price quotations are requested <br /> within 3 working days from the date of this PCO. <br /> 3 ❑ All concerned are authorized to proceed with the work of this Potential Change Order on a time and material basis. <br /> Daily time and material slips must be signed by an authorized representative of RCS for verification of time and <br /> materials utilized to complete the work requested. <br /> CC: SWD/File BY: Scott W.Drebltlzo <br /> DL/Field Senior Project Manager <br /> NOTES: 1.)Subcontractors receive all PCO's via email unless otherwise noted. <br /> 2.)This change may affect project completion schedule. All Subcontractors must advise in writing of any impact of this change on their operation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.