Browse
Search
2020-032-E AMS - Racanelli Construction epoxy flooring drain
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-032-E AMS - Racanelli Construction epoxy flooring drain
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:08:55 AM
Creation date
1/21/2020 10:35:14 AM
Metadata
Fields
Template:
Contract
Date
1/15/2020
Contract Starting Date
1/15/2020
Contract Ending Date
2/14/2020
Contract Document Type
Contract
Amount
$4,997.00
Document Relationships
R 2020-032 AMS - Racanelli Construction epoxy flooring drain
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br /> 0 <br /> 0 <br /> c <br /> W <br /> m' <br /> Racanelli Construction South, Inc. <br /> Piedmont Food&Ag Freezer Pricing Sheets PCO 2: Roof drinage extension o <br /> aa,r� o.cc o srrc s— 0 <br /> v <br /> ao <br /> Unit Price TOTAL ESTIMATED—IFUnit Price TOTAL ESTIMATED OTAL ESTIMATED SUB TOTAL ESTIMATED MATT O <br /> CODE DESCRIPTION . QUANTITY UNIT Labor LABORCOST Mat'I MATERIAL COST Unit Price Sub COST COST CODE m <br /> REF <br /> 1 Material 4x5 downspout x 10' 1 EA 37.33 37 $ 37 w <br /> 2 Material 4x5 to 6"offset adapter PVC 1 EA 29.67 30 $ 30 4 <br /> 3 Material 6"smooth wall PVC pipe(10') 6 EA 35.00 210 $ 210 °D <br /> 4 Material 6"smooth wall 90 degree fitting 1 EA 25.20 25 $ 25 <br /> m <br /> 51 Material PVC cement&primer 1 EA 26.00 26 $ 26 <br /> 6 $ <br /> rn <br /> IV <br /> 7 $ cn <br /> 8 Labor Procure mat.&tools,&del. 4 MH 30.63 123 $ 123 <br /> rn <br /> 9 Labor Hand excavation 10 MH 30.63 306 $ 306 4 <br /> w <br /> 10 Labor Pipe,downspout&adapter installation 6 MH 30_63 184 $ 184 OD <br /> 11 Labor Backfill&compact trench 4 MH 30.63 123 $ 123 n <br /> 12 Labor Clean up&return tools/equip 2 MH 30.63 61 $ 61 <br /> 13 - $ - <br /> 14 $ <br /> 15 $ <br /> 16 $ <br /> 17 $ <br /> 18 $ <br /> 19 $ <br /> 20 $ <br /> 21 $ <br /> 22 $ <br /> 23 $ <br /> 24 $ <br /> 25 $ <br /> 26 $ <br /> 27 $ <br /> J <br /> $ <br /> $ <br /> 1 is <br /> SHEET TOTALS II II II II II 796 C 328 =� $ 1,125 �I <br /> Check $ 1,125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.