Browse
Search
2020-032-E AMS - Racanelli Construction epoxy flooring drain
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-032-E AMS - Racanelli Construction epoxy flooring drain
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:08:55 AM
Creation date
1/21/2020 10:35:14 AM
Metadata
Fields
Template:
Contract
Date
1/15/2020
Contract Starting Date
1/15/2020
Contract Ending Date
2/14/2020
Contract Document Type
Contract
Amount
$4,997.00
Document Relationships
R 2020-032 AMS - Racanelli Construction epoxy flooring drain
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: BOOE2CO3-7FB1-43E1-B462-15595673B8DC <br /> r-MU111VIR rood and Ag Freezer <br /> Racanelli Change Order Request <br /> Racanelli Construction South, Inc. Proposal and Pricing Summary <br /> 1001 Pemberton Hill Road,Suite 202 RCS Project#19-008 <br /> Apex,NC 27502 Date: 11/11/2019 <br /> Submitted To: <br /> Orange County <br /> 131 West Margeret Lane COR#2 <br /> Hillsborough, NC 27278 <br /> Attention : Angel Barnes via email <br /> Per RCS PCO#2 dated 11/11/19, we are pleased to provide the following proposal per on-site request of Orange <br /> County 11/5/19: <br /> -Racanelli to look at pricing to install drainage underground between dock and new pad and daylight out to the wooded <br /> area northeast of building. Per discussion with Tim Smith/Summit: Drainage pipe to be 6" smooth wall PVC. <br /> Labor Material <br /> Unit Unit Sub Unit Labor Material Subcontractor <br /> Item Qty Unit Price Price Price Total Total Total Total <br /> 1 Racanelli(See attached) 1 LS $ 796.00 $ 328.00 $796 $328 $ 1,125.00 <br /> Subtotals $796 $328 $ 1,125.00 <br /> Small Tools&Consumables @ 7% on $ 796.00 $ 55.72 <br /> General Conditions $ - <br /> Labor Burden 38% on $ 796.00 $ 302.48 <br /> Sales Tax on Materials 7.50% on $ 328.00 $ 24.60 <br /> Racanelli Construction South Overhead @ 10% on $ 1,507.80 $ 150.78 <br /> Racanelli Construction South Profit @ 5% on $ 1,658.58 $ 82.93 <br /> Insurance Premium @ 1.35% on $ 1,741.51 $ 23.51 <br /> TOTAL AMOUNT OF CHANGE ORDER REQUEST <br /> TOTAL TIME(CALENDAR DAYS) REQUESTED FOR THIS CHANGE <br /> Change Order Request accepted and authorized for contract Change Order <br /> Authorized By Architect: Date: <br /> Authorized By Owner: Date: <br /> CC: <br /> We Have Not been authorized to proceed with this work. By: saott W.DrebCtlzzo <br /> This Proposal may be withdrawn from us if not accepted within 15 Days. Vice President <br />
The URL can be used to link to this page
Your browser does not support the video tag.