Browse
Search
2020-031-E AMS - Summit BOE stormwater mitigation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-031-E AMS - Summit BOE stormwater mitigation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:05:52 AM
Creation date
1/21/2020 10:34:53 AM
Metadata
Fields
Template:
Contract
Date
1/22/2020
Contract Starting Date
1/14/2020
Contract Document Type
Agreement - Services
Amount
$44,000.00
Document Relationships
R 2020-031 AMS - Summit BOE stormwater mitigation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />January 8, 2020 Revised January 14, 2020 <br /> <br />Sandra D’Arensbourg <br />Orange County Asset Management Services <br />sdarensbourg@orangecountync.gov <br /> <br /> <br />Re: Orange County Stormwater Services Fee Proposal <br /> RFQ#5267 – Qualification Proposal Sent 8/22/19 <br /> <br />Dear Ms. D’Arensbourg: <br /> <br />SUMMIT is pleased with the opportunity to provide this scope and fee proposal for <br />consulting services for the development of the above referenced properties. The <br />following scope and fees are based on our January 2, 2020 meeting where all of the <br />projects were discussed in great detail. We look forward to working with you to meet <br />the needs and goals for these projects. <br /> <br />A more detailed description of each project along with a sketch highlighting scope <br />of work for each project is in Appendix A. <br />SCOPE OF WORK <br />The following Tasks would be similar for all buildings except the Motor Pool / <br />Transportation Administration building which has more detail for plan preparation. <br />The Motor Pool design is to include permitting drawings but not being bid at this <br />time. The Transportation Administration Building is to include a sanitary sewer <br />extension which will require a separate NCDENR sewer line extension permit and <br />certification. Zoning permit (ZCP), COA and minor works applications will be <br />included where needed within the Historic District (all but the Motor Pool facility). <br /> <br />Task 1 – Due Diligence / Schematic Design – Concept Report: <br />SUMMIT will perform due diligence on each site including a field walk identifying <br />problem areas. The information gathered at these field walks will be used to <br />develop conceptual solutions. These solutions along with Atlas Engineering’s review <br />will be put together to generate a Concept Report. This Report will identify problem <br />areas and recommended solutions for the problems. If proposed improvements <br />exceed project funds, we will prioritize the list to allow the County to select what <br />improvements should be made at this time. <br /> <br />DocuSign Envelope ID: 216C4F0B-B6EC-41B3-B861-9632C4A197DD
The URL can be used to link to this page
Your browser does not support the video tag.