Orange County NC Website
<br /> <br />5 <br />COMPENSATION <br />SUMMIT agrees to provide professional services as outlined above in the Scope of <br />Services. Our fee proposal is based on man-hour projections and applicable billing <br />rates for the scope of work and schedule as described and anticipated for this <br />project. SUMMIT proposes a lump sum fee to be invoiced monthly on a percent <br />complete basis, with payment due upon receipt. <br /> <br /> <br />SCOPE OF SERVICES – Board Of Elections FEE <br />TASK 1 – Due Diligence / Schematic Design - Concept Report $2,500 <br />TASK 2 – Detailed Design $13,800 <br />TASK 3 – Contract Documents and Bid Assistance $5,000 <br />Atlas Engineering Including 15% markup $12,200 <br />Geotechnical $4,000 <br />Cumming Cost Estimating $6,500 <br />TOTAL FEES $44,000 <br /> <br />SCOPE OF SERVICES – Sheriff’s Office FEE <br />TASK 1 – Due Diligence / Schematic Design - Concept Report $500 <br />TASK 2 – Detailed Design $500 <br />TASK 3 – Contract Documents and Bid Assistance $1,000 <br />Atlas Engineering Including 15% markup $10,500 <br />Geotechnical $3,000 <br />Cumming Cost Estimating $2,000 <br />TOTAL FEES $17,500 <br /> <br />SCOPE OF SERVICES – Whitted Building FEE <br />TASK 1 – Due Diligence / Schematic Design - Concept Report $8,500 <br />TASK 2 – Detailed Design $34,000 <br />TASK 3 – Contract Documents and Bid Assistance $5,000 <br />Atlas Engineering Including 15% markup $14,300 <br />Geotechnical $5,000 <br />Cumming Cost Estimating $7,000 <br />TOTAL FEES $73,800 <br /> <br /> <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 216C4F0B-B6EC-41B3-B861-9632C4A197DD