Browse
Search
2020-031-E AMS - Summit BOE stormwater mitigation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-031-E AMS - Summit BOE stormwater mitigation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:05:52 AM
Creation date
1/21/2020 10:34:53 AM
Metadata
Fields
Template:
Contract
Date
1/22/2020
Contract Starting Date
1/14/2020
Contract Document Type
Agreement - Services
Amount
$44,000.00
Document Relationships
R 2020-031 AMS - Summit BOE stormwater mitigation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2 <br /> <br /> Task 2 – Detailed Design: <br />SUMMIT will develop construction drawings for each facility. The construction <br />drawings will be reviewed by the County prior to us developing bid documents. Our <br />subconsultant Cumming will provide 3rd party cost estimating services for the <br />proposed improvements. If costs exceed project funds, the contract documents will <br />include alternatives for projects over the estimated amount to allow the County to <br />get bids and determine what improvements can be built at this time. <br /> <br />Task 3 – Contract Documents and Bid Assistance: <br /> <br />Bid Administration – <br />SUMMIT will prepare project specifications and bid documents. We will also <br />assist in advertising the project, public bid opening, perform a bid review, <br />prepare bid tabulations of the bids received, and submit a formal bid award <br />recommendation to the County. Attend preliminary and other meetings <br />throughout the Design and Bid process. <br /> <br />Construction Administration – <br />SUMMIT will provide onsite inspection personnel that will periodically monitor <br />the contractor’s adherence to the project plans and specifications. SUMMIT <br />will review and approve all Pay Application and facilitate the processing of <br />any necessary Change Orders. The project team will perform a final <br />inspection of all locations and develop a punch list. We will monitor the <br />completion of the final punch list and review the final pay application. <br />Task - Geotechnical services have been identified for each building as follows. <br /> <br />Board of Elections – Six hand auger borings will be performed at the Board of <br />Elections building and advanced to 6 feet or hand auger refusal, whichever comes <br />first. Piezometers will be installed at two of the hand auger boring locations. <br /> <br />Sheriff’s Office – Three hand auger borings will be performed at the Sheriff’s Office <br />and advanced to 6 feet or hand auger refusal, whichever comes first. No piezometers <br />will be installed at this location. <br /> <br />Whitted Facility – Six borings will be advanced to 10 feet around the Recreation <br />building with two piezometers installed in those borings. Four borings will be <br />advanced to 10 feet around the Health building with temporary piezometers installed <br />in two of those borings. One boring will be advanced to 10 feet at the dumpster area, <br />and three borings will be advanced to 5 feet in the gravel parking lot leading to the <br />dumpster to determine if more gravel will be required. Borings will be terminated if <br />auger refusal occurs. <br /> <br />DocuSign Envelope ID: 216C4F0B-B6EC-41B3-B861-9632C4A197DD
The URL can be used to link to this page
Your browser does not support the video tag.