Orange County NC Website
15 <br /> This is a PreliminaryFeasibilityStudy <br /> • Further detailed railroad capacity modeling would be needed to <br /> confirm infrastructure requirements <br /> • Cost estimates require further definition <br /> o Cost estimates are planning-level <br /> o No engineering has been performed yet as part of this study <br /> o Cost estimates would be refined once preliminary engineering <br /> work and railroad capacity modeling is completed <br /> • Ridership estimates would require further refinement <br /> GO FORWARD <br /> A COMMUNITY INVESTMENT IN TRANSIT <br />