Browse
Search
2020-023-E AMS - Sasser Companies SW conference room remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-023-E AMS - Sasser Companies SW conference room remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 4:55:33 PM
Creation date
1/15/2020 4:44:21 PM
Metadata
Fields
Template:
Contract
Date
1/13/2020
Contract Starting Date
1/13/2020
Contract Ending Date
4/17/2020
Contract Document Type
Agreement - Construction
Amount
$281,324.00
Document Relationships
R 2020-023 AMS - Sasser Companies SW conference room remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page | 2 <br /> <br /> <br /> <br />GENERAL CONDITIONS <br /> <br />x Permits ($2,000.00 Allowance) <br />x Site Supervision <br />x Debris removal and disposal <br />x Temporary toilet <br />x Clean-up <br /> <br />MICROBIAL REMEDIATION <br /> <br />x We include removal of the carpet in the training room. Demolition of drywall, insulation <br />and trim at the back wall of the training room and part of the ceiling that has been <br />affected by water. We include removal of the affected fabric sound panels at the back of <br />the room as well. Microbial remediation of the entire training room will include a clean <br />and HEPA vacuum of all surfaces and contents in the room to inc lude the ceiling mounted <br />projector. Duct cleaning and Post Remediation Verification Testing is also included. All <br />work will be performed in accordance with Targeted Indoor Environmental Air Quality <br />Assessment dated 12/10/19 and IICRC S520 Standards. <br /> <br />ROUGH FRAMING <br /> <br />x We have included an allowance of $5,000.00 for rot repairs that may be uncovered during <br />demolition of the roof and training room. <br /> <br />DRYWALL & INSULATION <br /> <br />x We include installing new batt insulation in the walls and ceiling where it is removed <br />during the remediation. <br /> <br />x 5/8” drywall will be replaced where removed and finished ready for paint. <br /> <br />FINISH CARPENTRY <br /> <br />x We include replacing the 1x6 window casings and trim boards on the back wall of the <br />training room that are removed for the remediation. <br /> <br />PAINTING <br /> <br />x We include sealing and painting all new drywall and trim, painting of the entire training <br />room drywall and trim. <br /> <br />DocuSign Envelope ID: 255543A4-9671-40CE-B2D7-01BAE39CF353
The URL can be used to link to this page
Your browser does not support the video tag.