Browse
Search
2020-023-E AMS - Sasser Companies SW conference room remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-023-E AMS - Sasser Companies SW conference room remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 4:55:33 PM
Creation date
1/15/2020 4:44:21 PM
Metadata
Fields
Template:
Contract
Date
1/13/2020
Contract Starting Date
1/13/2020
Contract Ending Date
4/17/2020
Contract Document Type
Agreement - Construction
Amount
$281,324.00
Document Relationships
R 2020-023 AMS - Sasser Companies SW conference room remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page | 3 <br /> <br /> <br /> <br /> <br /> <br /> <br />FLOORING <br /> <br />x We include floor preparation and replacement of the carpet tiles in the training room. We <br />have included a $20/sy allowance for the carpet tiles (to be selected by owner) <br /> <br />ACOUSICAL PANELS <br /> <br />x We include fabricating and installing six (6) new sound panels on the back wall of the <br />training room. Panels will be Alphasorb 1’ thick square edge construction with fabric to <br />match the existing panels. <br /> <br />ELECTRICAL <br /> <br />x We include detaching and resetting the ceiling light fixtures and projector as required to <br />complete the demolition and mold remediation. <br /> <br />SMOKE DETECTOR <br /> <br />x We include detaching and resetting one (1) existing smoke detector head that is in the <br />area of the drywall demolition. <br /> <br />ROOF REPLACEMENT <br /> <br />x Engineered drawings for metal roof replacement and low slope roof replacement <br /> <br />x Metal roof repairs to include removal of the existing R-panel roof system. Apply a high <br />temperature ice and water shield. Fabricate and install 24-gauge drip edge. Fabricate and <br />install 24-gauge galvalume S-2000 metal roof panels. Fabricate and install 24-gauge gable <br />trim and high eve flashing trim. Fabricate and install Z-closures as needed. (40-year finish <br />warranty and a 20-year weathertight warranty) <br /> <br />x Low slope repairs include removal of the existing membrane and insulation. Installation <br />of new R-30 insulation board. Install a fully adhered .36 mil FiberTite membrane. (20-year <br />Warranty) <br /> <br />x Existing gutters and fascia to be inspected and remain in place. In the event that the <br />gutters have to be removed they will be protected and reinstalled. <br /> <br />DocuSign Envelope ID: 255543A4-9671-40CE-B2D7-01BAE39CF353
The URL can be used to link to this page
Your browser does not support the video tag.