Browse
Search
2020-011-E IT - Xentegra DUO authentication implementation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-011-E IT - Xentegra DUO authentication implementation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2020 2:20:44 PM
Creation date
1/8/2020 1:53:45 PM
Metadata
Fields
Template:
Contract
Date
12/13/2019
Contract Starting Date
12/13/2019
Contract Ending Date
6/30/2020
Contract Document Type
Agreement - Services
Amount
$12,155.00
Document Relationships
R 2020-011 IT - Xentegra DUO authentication implementation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 PERIOD OF PERFORMANCE <br />ESTIMATED TIMELINE <br />The estimated timeline for the Services will begin within sixty (60) days after execution of this Statement of Work <br />and continue for not more than six (6) months. If Services have not been scheduled at the execution of this <br />Statement of Work, a timeline will be developed mutually by the Parties and agreed to before each Phase of the <br />Services begins. The actual start date will depend on the following considerations: <br />x Scheduled availability of a Systems Engineer <br />x Receipt of Product(s) and necessary equipment <br />x Receipt of the signed Statement of Work from OG prior to the proposed start date <br />x Receipt of a purchase order from OG <br />CANCELLATIONS <br />XenTegra will work with OG to assign resources based on the mutually agreed timeline and schedule for the <br />project. Because XenTegra will commit consulting resources based on the established schedule, OG is required to <br />provide at (3 business days’ notice) for any unplanned changes or cancellations to the schedule. Should OG fail to <br />provide such notice, XenTegra reserves the right to bill for 4 hours (1/2 Day) at the established hourly rate and for <br />any non-refundable expenses incurred in preparation for such canceled services. All scheduled days will bill at 80% <br />of the hours scheduled for the day. <br />CHANGE MANAGEMENT PROCESS <br />If items requiring a scope change are identified during the project phases, the following are the high-level steps <br />that XenTegra will follow to discuss these with OG’s management: <br />x Discuss and confirm the need for additional scope change <br />x Identify additional tasks and deliverables associated with the scope change <br />x Estimate the work effort associated with the additional tasks and deliverables <br />x Based on the work effort estimate, determine the impact on schedule and budget <br />x Draft a new Statement of Work if the estimate: <br />o Requires additional resources <br />o Affects the project timeline or budget <br />DocuSign Envelope ID: D75DC1A2-5BE1-4C99-A19E-1D924AA1CD85
The URL can be used to link to this page
Your browser does not support the video tag.