Browse
Search
2020-011-E IT - Xentegra DUO authentication implementation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-011-E IT - Xentegra DUO authentication implementation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2020 2:20:44 PM
Creation date
1/8/2020 1:53:45 PM
Metadata
Fields
Template:
Contract
Date
12/13/2019
Contract Starting Date
12/13/2019
Contract Ending Date
6/30/2020
Contract Document Type
Agreement - Services
Amount
$12,155.00
Document Relationships
R 2020-011 IT - Xentegra DUO authentication implementation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 9 <br />READINESS PHASE <br />XenTegra will provide support for OG’s IT staff to test the solution to verify solution functionality before rollout to <br />end users. This phase includes the following tasks: <br />x Instruct pilot users on how to access environment for testing and validating solution functionality <br />x Conduct interviews with pilot users and document responses <br />x Document pilot testing results <br />x Rollout any additional servers in accordance with the installation policies and procedures defined and <br />documented in the previous phases <br />ROLLOUT PHASE <br />During this phase, the solution will be rolled out to the pilot end users and XenTegra will provide support to assist <br />with changes to the implementation as identified during the Rollout Phase. This phase includes the following <br />tasks: <br />x Assist OG with any issues associated with rolling out the final pilot users associated with the project <br />x Create as-built documentation delivered as a PDF document that details the configuration of the solution <br /> <br /> <br />TASKS OUT OF SCOPE <br />The following tasks are considered to be out of scope for this project: <br />x Network changes (Router, Switch) <br />x Server infrastructure moves, adds, changes <br />x Troubleshooting configurations for systems that are assumed to be in place and functioning prior to the <br />start of the project. These systems include but are not limited to, Active Directory, Group Policy, DNS, <br />DHCP, Authentication solutions, server, network, and storage infrastructure. <br />x Troubleshooting of user workstations or configurations outside of what is required for solution testing <br />x Installation of applications beyond those identified in this Statement of Work <br />x Backup of Customer systems, data, or configurations prior to upgrade or installation <br />x Configuration or troubleshooting of an existing environment <br />x Creation or execution of any test plans, formal or informal <br />x Providing formal system training <br />x Any task that is not explicitly defined in this Statement of Work <br /> <br />DocuSign Envelope ID: D75DC1A2-5BE1-4C99-A19E-1D924AA1CD85
The URL can be used to link to this page
Your browser does not support the video tag.