Browse
Search
2020-004-E Planning - In Water Services LakeOrange intake tower service
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-004-E Planning - In Water Services LakeOrange intake tower service
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 9:57:59 AM
Creation date
1/6/2020 9:34:34 AM
Metadata
Fields
Template:
Contract
Date
12/31/2019
Contract Starting Date
12/23/2019
Contract Ending Date
3/16/2020
Contract Document Type
Contract
Amount
$3,500.00
Document Relationships
R 2020-004 Planning - In Water Services LakeOrange intake tower service
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phone: 336-272-5500 <br /> <br /> <br />1011 N. Raleigh St. <br />Greensboro, NC 27405 <br />QQuotation <br />Quotation #: <br />Date: <br />Customer ID: <br />Page: 1 <br />To: <br />Your Order # Our Order # Sales Rep. Terms <br /> <br />Quantity Description Total <br /> Lake Orange Sluice Gate Cleaning: <br /> <br />Scope of Work: <br /> <br />1. Pressure washing and/or manually cleaning and then lubricating <br />the gate tracks/wedges/guides; <br />2. Cleaning and readjusting the gate stem guides; <br />3. Lubricating the grease fittings on the existing gate actuator; <br />4. Cleaning and lubricating the upper stem/screw (above/inside the <br />actuator); <br />5. Opening (and then properly re-sealing) the exterior case of the top- <br />slab mounted gate actuator to evaluate whether moisture is <br />present inside the actuator, clean and lubricate any/all accessible <br />parts inside the actuator prior to re-sealing the exterior case; <br />6. Test operating all cleaned and lubricated hardware; <br />7. Overall pressure washing of the interior of the intake tower (top to <br />bottom) and subsequent flushing of all debris/sediment through <br />the 48” outlet pipe. <br /> <br />Notes: Item number 5: Case will be opened and evaluated. This item <br />may require additional time or parts to repair. Quoted: open, inspect <br />and add fresh grease only. <br /> 3,500.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 3,500.00 <br />Quotation valid for 60 days. <br />This is a quotation on the goods named, subject to the conditions noted below: <br />To accept this quotation, sign here and return: __________________________ <br />Quotation prepared by: <br />Attachment DDocuSign Envelope ID: 884B2CFE-2DE5-44E8-9F7A-8208DA7367FC
The URL can be used to link to this page
Your browser does not support the video tag.