Browse
Search
2019-919-E AMS - Atlas Engineering Motor pool roofing
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-919-E AMS - Atlas Engineering Motor pool roofing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 9:44:17 AM
Creation date
1/6/2020 9:29:45 AM
Metadata
Fields
Template:
Contract
Date
12/16/2019
Contract Starting Date
12/16/2019
Contract Document Type
Agreement - Services
Amount
$23,350.00
Document Relationships
R 2019-919 AMS - Atlas Engineering Motor pool roofing
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for Engineering Services <br />Orange County Motor Pool Roof Replacement <br />Prepared for Orange County Asset Management Services <br />Prepared by Atlas Engineering - Project No.: J2400 <br />December 9, 2019 - Page 5 <br /> <br />Lists, As-Built Drawings, etc. and include them in a Final Report for issue to the Owner. <br />Hardcopy and electronic copies of the Final Report and As-Built-Drawings will be provided. <br /> <br />Fee for Professional Services <br /> <br />Based on our experience with similar projects, we are proposing the following lump sum <br />engineering fee for the above proposed scope of design, bidding and construction administration <br />services: <br /> <br /> Schematic Design (Fieldwork): $ 4,950 <br /> Design Development (25% CD): $ 800 <br /> Construction Document (75%): $ 2,055 <br /> Construction Document (100%): $ 3,350 <br /> Construction Document (Bid Documents) $ 1,325 <br /> Bidding and Contract: $ 1,650 <br /> Construction Administration: $ 8,720 <br /> Post Construction: $ 500 <br /> Total Engineering Fee: $ 23,350 <br /> <br />Preliminary Construction Estimate: The following preliminary estimated construction cost for the <br />work is provided: Motor Pool (11,000 sft removal and replacement of asphalt shingled roof system) <br />$110,000. This estimated cost does not include internal Owner costs (“soft costs”) or contingency <br />associated with this project. Future cost estimates provided as a part of the project scope will be <br />provided in the Owner’s required format. <br /> <br />If the Owner increases or decreases the scope of the project by 10% or more than the currently <br />estimated Construction Cost, Atlas will meet with the Owner to review impact on the proposed <br />scope of design, bidding, and construction work and the compensation for our services will be <br />adjusted as warranted by the impact. <br /> <br />Project Schedule <br /> <br />Atlas will perform our proposed services based on the schedule outlined in Attachment D “Key <br />Milestone Listing” provided with our proposal. Atlas will coordinate with the Owner to make <br />reasonable changes to the project schedule if needed. <br /> <br /> <br />DocuSign Envelope ID: 7C6D8FA9-77D8-4065-9CD5-3E2679971A07
The URL can be used to link to this page
Your browser does not support the video tag.