Browse
Search
2019-918-E AMS - Sasser ES Change Request 4
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-918-E AMS - Sasser ES Change Request 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 11:06:17 AM
Creation date
12/23/2019 10:20:17 AM
Metadata
Fields
Template:
Contract
Date
11/27/2019
Contract Starting Date
3/20/2019
Contract Ending Date
2/28/2020
Contract Document Type
Contract Amendment
Amount
$119,623.14
Document Relationships
2019-193-E AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2019-918 AMS - Sasser ES Change Request 4
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:AODF2D6C-3A18-4DOA-85FE-5237812F54C8 <br /> XNAVAS, <br /> ffr, <br /> Orange County Emergency Operations Center <br /> Proposal Request #3 <br /> 510 Meadowlands Drive <br /> Hillsborough, NC 27278 <br /> September 16, 2019 <br /> Mrs. Angela Crawford Easterday, <br /> Thank you for the opportunity to provide you with a proposal for the millwork repairs at the <br /> Orange County Emergency Operation Center located at 510 Meadowlands Drive in Hillsborough, <br /> NC. The project is generally described as the replacement of millwork damaged by water and <br /> mold. The proposal is based on proposal request #3 provided by Boomerang Design dated <br /> 8/26/19. <br /> We include replacing and installing the damaged cabinets in the breakroom and coffee area.The <br /> cabinets include two new base cabinets and a dishwasher panel in the 2nd floor breakroom and <br /> 88" of base and wall cabinets in the coffee area on the first floor. The laminate for the cabinets <br /> will be 4796-60 Burnished Chestnut by Wilsonart. The countertop for the coffee area on the first <br /> floor is included as it was damaged by mold and will be solid surface 9196RS Yukon Riverstone <br /> by Wilsonart. <br /> The items of work as required to complete the millwork repairs at the Orange County Emergency <br /> Operation Center located at 510 Meadowlands Drive in Hillsborough, NC will be performed for <br /> THE INVESTMENT OF: ............................................................................................................... $8,820.00 <br /> ALTERNATE: <br /> Alternate to replace the countertops in the breakroom with solid surface 9196RS Yukon <br /> Riverstone by Wilsonart. ........................................................................................................... $2,940.00 <br /> Thank you, <br /> A"-v of a w <br /> Jason Hayes <br /> Estimator <br /> Office (336) 449-1144 <br /> Cell (336) 380-3475 <br /> Jason@sassercompanies.com <br /> viione: (336)449-1144 PO Box 10,Whitsett NC 27377 Fax: (336)449-1151 <br /> www.SASSERCOMPANIES.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.