Browse
Search
2019-918-E AMS - Sasser ES Change Request 4
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-918-E AMS - Sasser ES Change Request 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 11:06:17 AM
Creation date
12/23/2019 10:20:17 AM
Metadata
Fields
Template:
Contract
Date
11/27/2019
Contract Starting Date
3/20/2019
Contract Ending Date
2/28/2020
Contract Document Type
Contract Amendment
Amount
$119,623.14
Document Relationships
2019-193-E AMS - Sasser Companies ES remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2019-918 AMS - Sasser ES Change Request 4
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:AODF2D6C-3A18-4DOA-85FE-5237812F54C8 <br /> CHANGE ORDER <br /> # 2c <br /> 481 Compass Dr <br /> Mebane, NC 27302 <br /> Phone: (919)964-1801 <br /> Compass Pointe Center <br /> TO: DATE: 11/14/2019 <br /> PROJECT: Ceramic Bathrooms &Shower <br /> Sasser Companies <br /> PO Box 10 <br /> Whitsett, NC 27377 <br /> ATTN:Jason Hayes <br /> QTY UNIT COLOR DESCRIPTION AMOUNT <br /> 362.250 SF Stonepeak 12"x 24"Color Green Sky $986.00 <br /> 200.000 EACH Stonepeak 6"x 12"Cove Base Color Green Sky $1,500.00 <br /> 462.250 SF Install Ceramic FLOOR(Includes Base) $2,311.25 <br /> 3.000 EACH Schluter Reno-TK Anodized Aluminum $60.00 <br /> 7.000 EACH Mapei Ultracolor Plus Color 11 Saraha Beige&Color 38 Avalanche $280.00 <br /> 8.000 EACH Mapei UltraFlex LHT Thinset $160.00 <br /> 1.000 EACH Freight Charges $75.00 <br /> 4.000 EACH Schluter Dilex-KSA Anodized Aluminum $120.00 <br /> 6.000 EACH Durarock 1/2"Backerboard $108.00 <br /> 6.000 EACH Install Backerboard $135.00 <br /> 4.000 EACH Mapei Floor Mud $48.00 <br /> 1.000 EACH Install Mud Bed $300.00 <br /> 1.000 EACH Mapei WaterStop Waterproofing $175.00 <br /> 1.000 EACH Waterproofing Labor $150.00 <br /> 108.540 SF Install Ceramic WALL(Includes Shower Floor) $759.78 <br /> 16.000 SF Stonepeak 2"x 2"Color Green Sky Mosaic $158.88 <br /> 6.000 EACH Schluter Schiene A80 Anodized Aluminum $60.00 <br /> 84.700 SF DalTile Linear Color Wheel Collection Color Artic White 4"x 8, 12, 16" $296.45 <br /> 13.200 SF DalTile Linear Color Wheel Collection Color Suede Gray 4"x 16" $46.20 <br /> 10.640 SF DalTile Linear Color Wheel Collection Color Chalkboard 4"x 12" $37.24 <br /> Sales Tax $582.51 <br /> Total $8,349.31 <br /> NOTES: <br /> Price Includes material cost,taxes,and installation <br /> ACCEPTED BY: <br /> By: By: Sasser Companies, Inc. <br /> SiGNATURE DATE SIGNATURE DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.