Browse
Search
Minutes 11-19-2019 Business Meeting
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2019
>
Minutes 11-19-2019 Business Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 12:23:08 PM
Creation date
12/12/2019 12:20:44 PM
Metadata
Fields
Template:
BOCC
Date
11/19/2019
Meeting Type
Business
Document Type
Minutes
Document Relationships
Agenda 11-19-19 Business Meeting
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 11-19-19 Business Meeting
Agenda 11-19-19 Item 4-a - Driving is Exhausting Campaign
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 11-19-19 Business Meeting
Agenda 11-19-19 Item 5-a - Public Hearing Regarding an Economic Development Recruitment Incentive for Piedmont Metalworks, LLC
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 11-19-19 Business Meeting
Agenda 11-19-19 Item 6-a - Link Government Services Center Remediation Project Options for Consideration
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 11-19-19 Business Meeting
Agenda 11-19-19 Item 8-b - Fiscal Year 2019-20 Budget Amendment #3
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 11-19-19 Business Meeting
Agenda 11-19-19 Item 8-c - Joint Driveway Easement – 306 Revere Road, Hillsborough
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 11-19-19 Business Meeting
Agenda 11-19-19 Item 8-d - Change in BOCC Meeting Schedule for 2020
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 11-19-19 Business Meeting
Agenda 11-19-19 Item 8-e - Authorization for the County Manager to Execute Contracts for the Purchase of a New Ambulance and Ambulance Remount
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 11-19-19 Business Meeting
Agenda 11-19-19 Item 12-1 - Information Item - November 7, 2019 BOCC Meeting Follow-up Actions List
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 11-19-19 Business Meeting
Agenda 11-19-19 Item 12-2 - Information Item - Memorandum - Minutes - Intergovernmental Collaboration with Municipal Partners
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 11-19-19 Business Meeting
Agenda 11-19-19 Item 12-3 - Information Item - FY 2019-20 First Quarter Financial Report
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 11-19-19 Business Meeting
ORD-2019-069 Fiscal Year 2019-20 Budget Amendment #3
(Attachment)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2019
PRO-2019-024 Care to Share Day Proclamation
(Attachment)
Path:
\Board of County Commissioners\Proclamations\2010-2019\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 <br /> <br />Angie Easterday said water drainage away from the building relies on the sealant joints. <br />She said the original design of the building did not include continuous sheathing, which is a <br />concern. <br />Chair Rich asked if this was a flaw in the original design, or the construction of the <br />original design. <br />Angie Easterday said it was a flaw in the original drawings, and there were other areas <br />of concern. She said there were breaches in the design in the sheathing, which was included in <br />the original bid documents on how to fix. <br />Angie Easterday said at some point in time, the weeps have been sealed so moisture <br />was not able to go outside of the building, causing rusted lintels, flashing failure, not continuous <br />flashing, cast caps should have been anchored, and the seals have failed. She said the rusted <br />deck is unusual. She said the building is structurally sound, but water is entering the cavity. <br />She said the original bid documents addressed the removal of all the lintels; removal and <br />replacement of all windows; resealing the cast bands; removal of all dry wall along perimeter <br />walls; removal of all fiberglass insulation; sealing everything, with an external test to be <br />conducted by the contractors; new finishes; new flooring; stair continuity issues; ADA upgrades; <br />landscaping; etc. She said the County also requested a new roof and repairs to second floor <br />lobby area. <br /> <br /> <br /> <br /> <br />Angie Easterday said when the additional water infiltration happened in October, <br />investigations were done from the interior of the building and more results were received. She <br />said there are numerous additional breeches that were not in design documents, and it is not <br />know when these breeches occurred. She said this will always be a problem, if one cannot <br />control water from getting inside. She said the building structure is still sound, but there is <br />cracking in the tile between columns which is unusual, and the waterproofing done in 2018, <br />which was applied to the exterior walls, is starting to fail. She said it is unclear if this is because <br />of exposure, weed whacking, or other things, but the repairs are already starting to fail.
The URL can be used to link to this page
Your browser does not support the video tag.