Browse
Search
2019-895-E Solid Waste - NCDEQ grant for glass separation infrastructure
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-895-E Solid Waste - NCDEQ grant for glass separation infrastructure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 8:41:32 AM
Creation date
12/11/2019 8:34:54 AM
Metadata
Fields
Template:
Contract
Date
10/1/2019
Contract Starting Date
10/1/2019
Contract Ending Date
9/30/2020
Contract Document Type
Grant
Amount
$3,220.00
Document Relationships
R 2019-895 Solid Waste - NCDEQ grant for glass separation infrastructure
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
////////////////////////////////////////////////////////////////////////////////////////////////////////// <br />NOTE: Grant funding stops here. Further phases are conducted using County funds, equipment and employees. <br /> <br />Phase 4B – Remaining Commercial <br />November – January 2020 <br />Confirm the location, placement of carts, and number of carts needed at each remaining, non-glass- <br />heavy commercial location. November 2019 through January 2020 - All other commercial locations that <br />have not been transitioned to glass-only will be added to the program at this time. This step closes the <br />gap and completes the commercial segregated glass initiative. <br />Letters will be sent to property managers and business owners to distribute to their tenants informing <br />them of the glass-only carts. A site visit will be organized to evaluate the number of glass-only carts <br />needed and if removal of any single stream carts is necessary. Outreach and education will be <br />conducted at the newly engaged sites. New carts will be delivered where needed. <br />Phase 5 – Multi-unit housing <br />January – February 2020 <br />Based off the previous 4 phases an evaluation of our multi-unit housing locations will be conducted <br />during January. By February of 2020 we can then determine if we want to continue to spread the glass- <br />on-the-side initiative to our multi-unit dwellings or stop with commercial. <br />Overall Project budget Phases 1-4A <br />This assumes no new labor required (except for temporary outreach labor), assuming that Alamance and <br />Durham Counties are included and also a total of 500 new roll carts are acquired along with a self- <br />dumping hauling trailer, site signs, banners and educational handouts, new concrete pad for glass <br />dumping and loading, refurbishment of 13 existing roll-off containers to accommodate new signs and <br />decals, one new roll off container for Alamance County. Table 2 immediately below shows all costs for <br />Phases 2-4A, regardless of the source of funding. The request from DEACS on Table 3, follows, with each <br />County’s match detailed below that. <br />Table 2 Itemized Project Costs (regardless of who pays) <br />DocuSign Envelope ID: 70D8DD00-0712-4FFB-A412-CD2A7FF1E38B
The URL can be used to link to this page
Your browser does not support the video tag.