Orange County NC Website
AutoQuote 18.2 <br />EXCELLANCE, INC. AQ version 18.2 <br />453 Lanier Rd., Madison, Alabama 35758 7/23/2019 14:53 <br />1-800-882-9799 Quote # : <br /> Quoted by:LB <br /> PRICE QUOTE, ORDER FORM and WORK ORDER Excellance unit #:Pending <br /> CUSTOMER:Orange County Emergency Services " FILE NAME " : Type I Ford F-450 4x4 <br /> ADDRESS:PO Box 8181 DEALER: Factory Direct <br />Hillsborough, NC. 27278 <br />ADDRESS: 453 Lanier Road <br /> TELEPHONE:919-245-6126 Madison, AL. 35758 <br />FAX: TELEPHONE: 256-772-9321 <br />E-MAIL: amatthews@orangecountync.gov FAX: 256-772-8792 <br /> TECHNICAL <br /> CONTACT:Al Matthews SALESMAN: Tommy Pugh <br />This person is authorized to make any changes to the vehicle and/or <br />contract that may affect the final design, configuration, and cost of the unit. <br />1 SPECIAL NOTES AND/OR REQUESTS <br />1 <br />1 CHASSIS: $48,900.00 <br />1 BASE PRICE FOR CONVERSION: 139,898.58$ (INCLUDES ALL STANDARD FEATURES) <br />1 PRICE FOR OPTIONS: $65,918.03 <br />LESS DELETION CREDITS:-5178.5026 <br />LESS MANUFACTURING CREDIT: $0.00 $0.00 0 <br />1 "LOOSE" EQUIPMENT: $350.75 <br />1 FACTORY PAID TRANSPORTATION: $0.00 1 <br />1 PERFORMANCE BOND: $0.00 <br />DEALER PROVIDED / INSTALLED ITEMS: $0.00 <br />1 LESS PRE-PAYMENT DISCOUNT: $0.00 <br />1 LESS MULTI-UNIT DISCOUNT: $0.00 <br />DEALER CONCESSIONS: $0.00 <br />OEM CONCESSIONS: $0.001 <br />1 COST OF UNIT: $249,888.86 <br />1 <br />How "Cost of Unit" will be paid: <br />1 TRADE-IN CREDIT FOR USED UNIT: $0.00 <br />1 DEPOSIT WITH ORDER: $0.00 <br />1 BALANCE DUE UPON DELIVERY: $249,888.86 <br />THIS ORDER IS VALID ONLY IF ACCEPTED BY BOTH PURCHASER AND EXCELLANCE WITHIN 60 DAYS OF:7/23/2019 <br />* REVIEW THIS DOCUMENT CAREFULLY. IT TAKES PRECEDENCE OVER ALL OTHER DOCUMENTS. <br />* ANY ITEM NOT "SELECTED" ON THIS ORDER IS NOT INCLUDED IN THE PRICE FOR THE VEHICLE. <br />* AFTER THIS ORDER HAS BEEN ACCEPTED BY EXCELLANCE, ALL CHANGES MUST BE APPROVED <br /> BY EXCELLANCE AND EACH CHANGE WILL BE ASSESSED A $250.00 ENGINEERING CHARGE. <br />* ALL ENGINEERING DRAWINGS MUST BE INITIALED BY THE CUSTOMER BEFORE WORK IS BEGUN AND BEFORE <br /> PARTS WILL BE ORDERED BY EXCELLANCE. <br />* COMPLETION OF VEHICLE IS ANTICIPATED TO BE WITHIN 90 TO 120 DAYS FROM <br />THE LATTER OF: (A) RECEIPT OF CHASSIS, OR (B) RECEIPT OF WRITTEN PURCHASE ORDER WITH A COMPLETE <br />COPY OF THIS ORDER (WITH ALL QUESTIONS ANSWERED BY PURCHASER), OR (C) RECEIPT OF ALL PARTS <br />SUPPLIED BY PURCHASER (e.g., CUSTOMER AND/OR DEALER). <br />Page 1 7/23/2019 3:02 PM <br />ATTCHMENT ADocuSign Envelope ID: C3BD39C0-6CA0-4C46-9E28-269DE7D0AEEF