Orange County NC Website
REMOUNT PRICING <br />Version 19.0 <br />106 0 MAKE THE CHASSIS ROADWORTHY <br />107 (1)THERE WILL BE NO ADDED WORK PERFORMED TO THE TAKE-OFF CHASSIS. 0.00 0.00 <br />120 1 CHASSIS <br />121 (1)Dealer or Customer supplied chassis 426.98 426.98 <br />125 <br />THE FOLLOWING FIELDS DESCRIBING THE NEW CHASSIS MUST BE FILLED OUT REGARDLESS OF WHO IS <br />SUPPLYING IT. <br />129 ENTER MODELYEAR FOR NEW CHASSIS: <br />130 ENTER MODEL OF NEW CHASSIS: <br />131 ENTER MAKE OF NEW CHASSIS: <br />132 ENTER CAB TO AXLE MEASUREMENT OF NEW CHASSIS: <br />133 ENTER WHEELBASE MEASUREMENT OF NEW CHASSIS: <br />134 <br />135 <br />136 THE REMOUNT WILL HAVE THE FOLLOWING WORK INCLUDED IN THE STANDARD BASE CONVERSION: <br />137 CHASSIS INSPECTION <br />138 Inspected for damage and defects upon delivery <br />139 Test Drive <br />140 <br />The chassis shall be inspected against (A) Excellance's Chassis order, and (B) the specifications supplied by <br />the customer/ dealer. <br />141 All loose equipment received with the chassis shall be inventoried and stored. <br />142 <br />All chassis functions shall be tested for proper operation (accelerator, brakes, headlights, wipers, horn, radio, <br />air conditioner, gauges, dome lights, turn signals, parking lights, etc.). <br />143 <br />144 CHASSIS WORK TO BE PERFORMED <br />145 Heat Shields shall be installed above the exhaust system. <br />146 Chassis shall have undercoating applied. <br />147 Exhaust modifications shall be performed as necessary. <br />148 Air valve extensions shall be installed on the rear inner tires. <br />149 New mounting hardware shall be installed including: Grade 8 bolts, washers, nylon lock-nuts, spacers, outriggers (Type I units only) <br />150 New mounting bracket for the rear bumper shall be installed to the chassis frame. <br />151 Chassis high idle system shall be connected and operational. <br />152 Chassis electrical charging/ battery system shall be connected to the module electrical system. <br />153 New Chassis emergency light wiring shall be installed (Grille, Intersection lights, etc.) <br />154 All power cables connecting the chassis electrical system to the modular electrical system shall be replaced. <br />155 The chassis fuel fill shall be installed in accordance with current QVM standards. <br />156 <br />Modular Air conditioning system shall have a vacuum performed and shall be recharged with 134A Freon with <br />ultra-violet leak identification air conditioning oil dye installed into the system. <br />157 The module to chassis heater valves shall be replaced. <br />158 <br />Chassis to module attachment shall be finished off via Excellance fabricated close out panels and a rubber <br />seal on a Type III units. A cab to module rubber accordion style boot shall be installed on EHD and Type I units. <br />159 New Front module mounted stone guards. <br />160 New back-up alarm <br />2019 <br />Ford <br />F550 4x4 <br />108" <br />189" <br />Rev: 05/21/19 3 of 16 7/23/2019 1:11 PM <br />DocuSign Envelope ID: 894792A6-7781-44EE-8915-1BC88F8277CE