Orange County NC Website
a <br /> BUILDING PLANS AND SPECIFICATIONS <br /> The following plans and specifications pertaining to the Building are incorporated herein by this reference: <br /> 1 . Gateway Center Site Plan, Utilities and Erosion Control Plans and Specifications consisting of <br /> - Drawing Nos: 1 - 16 prepared by Summit Consulting *Engineers last revised November 16, 2006 <br /> (Project No. 05-032). ' <br /> 2. Code Data, Elevations, Floor Plans, Roof Plan and other Building Plans, Cross Sections and <br /> Details for The Gateway Center consisting of Sheet Nos. Al — A_ 13 prepared by John C. <br /> Williams, Archite c last revised December 6, 2006 (Job No. 0600). <br /> 3 . Foundation, Fmming . and Other Plans for The .Gateway Center consisting of Sheet Nos . Sl -- S6 <br /> Prepared by Gardner & McDaniel Consulting Engineers dated October, 2006 (Job No, 06073). <br /> 4. Plumbing, Sanitary Waste, Vent and Water Supply Plans, Specifications, Calculations and <br /> Details for The Gateway Center consisting of Shut Nos. P-1 — P-9 prepared by John C. <br /> Williams, Architect, dated November 16, 2006 (Job No. 77-06). <br /> 5 . Mechanical. Specifications, Notes, Schedules, Details and Plans for The Gateway Center <br /> consisting of Sheet Nos. M 1 — M-6 prepared by John C. Williams, Architect, dated November <br /> i <br /> 16, 2006 (Job No. 77-06). <br /> 6. Electrical Specifications and Schedules for The Gateway Center cons <br /> pecifi y Tsang of Sheet Nos. ]r1 — <br /> E=5 prepared by John C. Williams, Architect, dated November 16, 2006 (Job No. 77= 06) . <br /> 7. Technical Specifications for Gateway Center prepared by Brockwell Associates, Inc., Architect <br /> f • . <br /> 4 9- <br />