Orange County NC Website
27 <br /> Recent History <br /> • November 19,2019 <br /> — Boald receives detailed report Horn architect <br /> — Board discusses options for next steps and provides direction to <br /> staff <br /> • November 21-22,2019 <br /> — Relocation planned tor remalning building occupants <br /> — Upfit of Whitted space to occur over winter <br /> OtAt(f(.a..tly <br /> 2 <br /> Options Summary <br /> 7. Fxiitty Prennina Project <br /> The NPnha G—Ws Pn,%w.P 6s ccnglwedm im a c'2021 <br /> Cunpnt Dwsnim Certpcand EnNrene+ t vdAgdt� I C*MarvrxamilaW <br /> Pkn fcr M1eire ixiny needsd.the orecell fPc•i[.cv+lert <br /> Amend FY2019 20Cee0e Bedgw tofund planning <br /> 2. Proceed with Reused Scope for Rernediefion Project <br /> Amend the FY2019-20 CaPU Budge:end proceedwilh the remediation Project <br /> $. Include funding in the FY2020-21 Ca pitel Budget for Remedafi Project <br /> . Evduete oMectegaW cnher Wftk greeds a,d revuesls <br /> A- other opuorui? <br /> dRw.rGe COIJn`r" <br /> 3 <br /> 4 <br /> 5 Commissioner Marcoplos said he noticed several problems just by looking at the <br /> 6 western wall of the building when it was being constructed in the early 90s. He said a new <br /> 7 building would be more energy efficient, and this building does not use solar options. He said it <br /> 8 would be interesting to quantify the energy savings with a new building design. <br /> 9 Commissioner Price said new construction may be wise, but asked if a new site location <br /> 10 would be needed. She asked if this current site could be used. <br /> 11 Angie Easterday said it is possible to rebuild on this site, but the building would need to <br /> 12 be reconfigured. <br /> 13 Bonnie Hammersley said one option is to look at other sites that the County owns. She <br /> 14 said the Northern campus will be completed soon, leaving the vacant detention center and <br /> 15 Revere Road sites. She said other sites may be available and considered, as well as looking <br /> 16 further into this site. She said an answer is not needed tonight, but staff wanted to bring the <br /> 17 BOCC up to date on the project. She said, as of Friday, all staff will be in new locations, and <br /> 18 can continue to function. She said a long-range plan is now needed, and she wants to come <br /> 19 back to the Board with something that will be functional for longer than 25 years. She said the <br /> 20 Link Center will be closed as of Friday, November 22. <br /> 21 Commissioner Price asked if the extent of the rusting in the structure could be identified. <br /> 22 Angie Easterday said, at times, there is significant water, but the building is not <br /> 23 structurally unsound. <br /> 24 Commissioner McKee said when there is more information it would be helpful to know <br /> 25 how this occurred. He said it is curious to him that there are 60-year old county buildings that <br /> 26 have not had these problems, and he wonders how this occurred so quickly. He said he would <br /> 27 also like to know if there is a way to reroof the building the avoid water infusion. He said he <br />