Browse
Search
ORD-2019-039 Budget Amendment #2-C – Approval of an Intermediate Budget for the Link Government Services Center Remediation Project
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2019
>
ORD-2019-039 Budget Amendment #2-C – Approval of an Intermediate Budget for the Link Government Services Center Remediation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2019 10:50:00 AM
Creation date
12/4/2019 10:42:22 AM
Metadata
Fields
Template:
BOCC
Date
11/7/2019
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8-g
Document Relationships
Agenda 11-07-19 Item 8-g - Budget Amendment #2-C – Approval of an Intermediate Budget for the Link Government Services Center Remediation Project
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 11-07-19 Regular Meeting
Minutes 11-07-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />revealed, “…a critical element of the building envelope, the continuous sheathing, was in fact, <br />not continuous.” The architect and engineer further reported that, “The breeches were irregular <br />enough to confidently say that a contractor would not be able to find all breeches and seal them <br />to prevent future water intrusion without removing all of the brick and cast stone.” The scope of <br />the current remediation project that was bid on two previous occasions does not include this <br />additional scope of work which would add to the projected cost and duration of the project and <br />may approach the cost and duration of new construction. <br /> <br />The architect who is contracted to work on the Link Remediation Project is scheduled to present <br />findings to the Board of Commissioners at the November 19, 2019 meeting. At that time, the <br />architect will also present options to proceed, including the probable costs and duration for each <br />option. <br /> <br />As these options are evaluated and implemented, both an industrial hygienist and an <br />occupational health professional who have been working with the County on this project have <br />advised relocating the building occupants on a short but reasonable timeline. <br /> <br />Budget Amendment #2-C provides an intermediate budget of $975,000 to relocate the Link <br />Government Services Center building occupants for the remainder of FY 2019-20. Of this total <br />amount, $127,000 in PAYGO funds will be redirected from two projects in the FY2019-20 <br />Capital Budget to the Asset Management Services operating budget to fund operational costs <br />related to rent, utilities, and maintenance. These capital projects will now be funded with debt <br />proceeds. <br /> <br />The remaining remediation related costs of $848,000 will be budgeted in the Link Center <br />Remediation Capital Project. This increase will be debt financed. Additional funds needed <br />beyond FY 2019-20 will be included in future fiscal year budget appropriations. <br /> <br />Upon approval of this budget amendment, the current Link Center occupants will be relocated to <br />four different locations: <br /> <br />• The Public Defender’s Office is being relocated to a leased building at 115 E. King Street. <br />• Finance and Administrative Services, Public Affairs, the Arts Commission Director, and <br />the Risk Manager will be relocated to a leased facility at 405 Meadowlands Drive. <br />• The Homeless Services Coordinator will move to existing office space in the Housing and <br />Community Development Department. <br />• The remaining occupants, the County Manager’s Office and the Clerk’s Office, will move <br />to the Whitted Building. <br />The leased facilities and the Whitted facility will be modified to accommodate a long term <br />relocation. <br /> <br />This budget amendment amends the following Link Center Remediation Capital Project, as well <br />as the Court Street Annex and Equipment & Vehicles Capital Project Ordinances: <br /> <br /> <br /> <br /> <br /> <br />2
The URL can be used to link to this page
Your browser does not support the video tag.