Browse
Search
Agenda - 04-25-2001-2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 04-25-2001
>
Agenda - 04-25-2001-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:54:38 AM
Creation date
8/29/2008 10:31:10 AM
Metadata
Fields
Template:
BOCC
Date
4/25/2001
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes - 04-25-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: April 25, 2001 <br />Action Agendo~a <br />Item No. <br />SUBJECT: Efland Area Sewer S stem Sewer Extension Process <br />DEPARTMENT: County Manager PUBLIC HEARING: (Y/N) No <br />ATTACHMENT(S): <br />Draft Sewer Approval Flow Chart <br />INFORMATION CONTACT: <br />County Engineer, ext 2300 <br />Planning Director, ext. 2585 <br />Cbun Attorne , 732-2196 <br />TELEPHONE NUMBERS: <br />Hillsborough 732-$1$1 <br />Chapel Hill 968-4501 <br />Durham 688-7331 <br />Mebane 336-227-2031 <br />PURPOSE: To present for BOCC review and approval, an outline or flow schematic that <br />delineates the steps in which subdivision projects with sewer extensions (from the Efland sewer <br />system) move through the County's plan submission, review and approval process. <br />BACKGROUND: There are a number of aspects of the operation of the Efland sewer system, <br />related particularly to the extension of sewer service to undeveloped land, that need to be <br />clarified and amplified. Specifically, the BOCC has asked that staff develop recommendations <br />as to the process by which a request to extend sewer service to undeveloped land will be <br />evaluated and approved. Recently the BOCC approved a concise map delineating the current <br />boundaries of the overall system plan for the Efland sewer system and adopted a resolution that <br />formally confirmed and ratified those boundaries. <br />As a second step in determining how extensions of the Efland sewer system to undeveloped <br />land within the boundaries of the overall system plan will occur, staff is now presenting a flow <br />chart containing its recommendations as to how a sewer extension request will be: <br />^ Submitted and integrated into the Concept and Preliminary Plan approval process <br />^ Evaluated by staff and the BOCC <br />^ Ultimately approved by the BOCC <br />FINANCIAL IMPACT: There is no direct financial impact associated with this item. <br />
The URL can be used to link to this page
Your browser does not support the video tag.