Orange County NC Website
06/07/05 BOCC Agenda Item, NPDES Phase II MOA Attachment 2 6 <br />ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT <br />Craig N. Benedict, AICP, Director <br />ee~n~P o, o <br />Administration ~;` , ~~;;, 'A 306E Revere Road <br />(919) 245-2575 '~ ,., _Q >> P O Box 8181 <br />(919) 644-3002 (FAx) ~ Hillsborough, <br />www.co.orange.nc.us '""°«e e.~~~`°° North Carolina, 27278 <br />MEMORANDUM <br />TO: Demetric Potts, Assistant Town Manager, Hillsborough <br />TROM: Will Autry <br />THROUGH: Craig Benedict <br />DATE: 10/07/04 <br />SUBJECT: NPDES Phase II stormwater Implementation for Hillsborough <br />COPIES: Margaret Hauth, Hillsborough; Iolm Link, Ren Ivins <br />ATTACHED: Hillsborough Phase II Implementation Schedule <br />In 1972, the National Pollutant Discharge Elimination System (NPDES) program was <br />established under the authority of the Clean Water Act. Phase I of the NPDES stormwater <br />program was established in 1990, It required NPDES permit coverage for lazge or medium <br />municipalities that had populations of 100,000 or more, Phase II of the NPDES stormwater <br />program was signed into law in December 1999. This regulation builds upon the existing Phase I <br />program by requiring smaller communities, also known as municipal separate storm sewer <br />systems (MS4s), to be permitted. The Town of Hillsborough was designated in the 2000 census <br />as a Phase II MS4, and made Phase II permit application in May 2004. Recently passed Senate <br />Bill 1210 clarified some timetables for implementation of Phase II regulations. <br />The Division of Water Quality (DWQ) is required to issue a draft permit for Hillsborough by <br />May 1, 2005.. After a brief period for public conmrents and participation, DWQ will issue the <br />final permit. Hillsborough will be required to implement post-construction stormwater <br />management controls within 24 months from the effective date of the permit, and the remaining <br />permit requirements must be put in place within five years fiom the effective date of the permit. <br />Orange County would like to implement the Phase II program for the Town according to an <br />annual contract, which could provide the Town a substantial cost savings, and through <br />cooperation provide for more efficient achievement of our mutual water quality goals. The cost <br />savings provided could also allow Hillsborough to achieve an expedited schedule for' the <br />implementation of each of the minimum measures required by DWQ. <br />Attached is the Hillsborough Phase II hmplementation Schedule, a table that describes the <br />proposed BMP's to be accomplished during each year after the permit is issued. Please be aware <br />that these years are neither calendar years nor fiscal years, but rather years from the effective <br />