Browse
Search
Agenda - 06-07-2005-9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 06-07-2005
>
Agenda - 06-07-2005-9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:12:16 PM
Creation date
8/29/2008 10:30:56 AM
Metadata
Fields
Template:
BOCC
Date
6/7/2005
Document Type
Agenda
Agenda Item
9c
Document Relationships
2005 S ERCD - MOA-Hillsborough & Orange Co-National Pollutant Discharge Elimination System Phase II
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2005
Minutes - 20050607
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/07/05 BOCC Agenda Item, NPDES Phase II MOA <br />STATE OF NORTH CAROLINA <br />COUNTY OF ORANGE <br />Attaclmient 4 12 <br />NPDES PHASE II <br />STORMWATER PERMIT <br />AGREEMENT <br />TOWN OF HILLSBOROUGH <br />MEMORANDUM OF AGREEMENT <br />This Memorandum of Agreement is entered into this day of , 200_, by <br />and between the Town of Hillsborough and Orange County. <br />WHEREAS, the promotion of a sustainable community that provides for the protection of <br />water quality and the elevation of the quality of life of the citizens of that community is in the <br />best interest of the Town of Hillsborough and Orange County; and <br />WHEREAS, the recent growth of the community, and that which is anticipated, will <br />make efforts to protect water quality not only more difficult, but also more essential; and <br />WHEREAS, the Orange County Erosion Control Division Staff of the Planning and <br />Inspections Department presently implements soil erosion and sedimentation control regulations, <br />State mandated Neuse River Basin Riparian Buffer Program, and assists with other stonnwater <br />concerns in the Town of Hillsborough and Orange County; and <br />WHEREAS, Section 402(p) of the Clean Water Act and implementing regulations 40 <br />CFR Part 122, 12.3 and 124, North Carolina General Statutes 14.3-215.1 and Session Law 2004- <br />163 require that the Town of Hillsborough implement a National Pollutant Discharge <br />Elimination System (NPDES) Phase II Stormwater Program; and <br />WHEREAS, Orange County and the Town of Hillsborough recognize the opportunity to <br />provide a more effective and efficient implementation of this NPDES Phase II Stornwater <br />Program working collaboratively; and <br />WHEREAS, the parties have been working cooperatively toward the development of a <br />system which will provide for the implementation of this Program, and ensure that the Town <br />maintains compliance with the forthcoming NPDES Phase II Stormwater Permit; <br />NOW, THEREFORE, the parties to this Memorandum hereby agree as follows: <br />Section 1. Upon issuance of the NPDES Phase II Stormwater Permit for the Town by the <br />State of North Carolina, Department of Environment and Natural Resources, <br />Division of Water Quality, the parties will work cooperatively to develop and <br />enter into a contract which will provide for the implementation of the majority of <br />the permit requirements of the Town's NPDES Phase II Stormwater Program by <br />the Erosion Control Division Staff of the Orange County Planning and <br />C:\Documents and SettingsWdministrator\local Settings\TempWtt 4 Dreft MOA 042505.doc 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.