Browse
Search
Agenda 11-19-19 Item 6-a - Link Government Services Center Remediation Project Options for Consideration
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2019
>
Agenda - 11-19-19 Business Meeting
>
Agenda 11-19-19 Item 6-a - Link Government Services Center Remediation Project Options for Consideration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 12:27:28 PM
Creation date
11/14/2019 12:29:07 PM
Metadata
Fields
Template:
BOCC
Date
11/19/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda 11-19-19 Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 11-19-19 Business Meeting
Minutes 11-19-2019 Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t,goy <br /> LANE W 14 <br /> 36722 ADDITIONAL CONSIDERATIONS <br /> 501 STREAM BUFFER (NOT IN PLACE IN 1992) <br /> 4 REM EDIATION/REHABILITATION: ALLOWABLE WITHIN <br /> THE CURRENT CONFIGURATION <br /> NEW CONSTRUCTION: WILL BE REQUIRED TO OBSERVE <br /> 50' BUFFER; BUILDING CONFIGURATION WOULD HAVE <br /> TO CHANGE <br /> SITE <br /> f <br /> EXISTING SITE SHOULD BE REGRADED FOR PROPER <br /> DRAINAGE <br /> RECENT APPLIED WATERPROOFING SHOWING <br /> DEGRADATION FAILURE LACK OF CONTINUITY IN <br /> SOME AREAS <br /> maw SCHEDULE <br /> REMEDIATION: REQUIRES TEDIOUS WORK AND <br /> COLINTY ORANGE THEREFORE LIKELY TO TAKE LONGER <br /> PO SOX 6181 r� r <br /> HILLSBOROUGH,NC 27278 i <br /> ='Stream Buffer 50ft 0.21 Annual Chance of Addresses —Parcel Line N <br /> NEW: REQUIRES NEW DESIGN, HOWEVER, <br /> g(Previously STATUS Soils Survey Slrearn „� <br /> Flooding <br /> —• <br /> Flo Annual Chance of >:1poding(PrBViously referred to as the SLHI- <br /> referred to as the 100- year flood zone) • Aclive . . <br /> 0 Parcels CONSTRUCTION LIKELY SHORTER <br /> year flood zone) Parcel_Lines S <br /> LINE CODE 1 inch =50 feet <br /> —Old Lot Line 60 K 60 Feet <br />
The URL can be used to link to this page
Your browser does not support the video tag.