Browse
Search
Agenda - 04-17-2001-8h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 04-17-2001
>
Agenda - 04-17-2001-8h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:52:35 PM
Creation date
8/29/2008 10:30:49 AM
Metadata
Fields
Template:
BOCC
Date
4/17/2001
Document Type
Agenda
Agenda Item
8h
Document Relationships
2001 S Solid Waste - Joyce Engineering, Inc Landfill Engineering Services Contract Addendum
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2001
Minutes - 04-17-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />February 6, 2001 <br />Memo <br />2301 West Meadowview Road, Suite 203 <br />Greensboro, North Carolina 27407 <br />Phone - 336.323.0092 <br />Fax - 336..323.b093 <br />jmchargue~joyceengineering.cam <br />Ta: GaYle Wdsan From: <br />Jan McHargue <br />Fax: Pages: 2 <br />Phone: Date: 2/OS/Ol <br />Re: Fee Estimate for Eubanks Road C&D CC: ~~ <br />^ Urgent x For Your Use l7 Please Comment ~ Please Reply ~ Please Recycle <br />I am attaching our estimate of fees needed to prepare and submit the Construction <br />Plan Appl~atian for the Embanks Road Site. Notes and assimnpti~ons follow: <br />• The costs on the. attached spreadsheet are for preparing and submitting the <br />construction plan application to the Solid Waste Section. This iec>ades the <br />additional hydrogeologic characterization required by the Section as a result of <br />their review of the site suitabdity application. . <br />• Based on our understanding of revised wetlands regulations obtained thmugh <br />cottversatians with S&EC, Inc. (wha performed the site specific work), there wi71 <br />be no further wetland investigation dr perrmittim~g needed. <br />• We assumed that we would attend two mee~ia~gs wish regt~latars and/or County staff. <br />• We assumed that surveying services waukl be corgract~ directly by the Coumy. <br />• The estimate for the Hydrogeologic Report is based on the assamption that four <br />additional wells wdl be installed; tliree additional piezomenters within the cell <br />footprint (as. discussed during the June 2000 meeting with the SWS), and an <br />• Page 9 p. cd~llcaer rtiena 1o A'"r' 020501 ~doq <br />
The URL can be used to link to this page
Your browser does not support the video tag.