Browse
Search
Agenda - 04-17-2001-8h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 04-17-2001
>
Agenda - 04-17-2001-8h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:52:35 PM
Creation date
8/29/2008 10:30:49 AM
Metadata
Fields
Template:
BOCC
Date
4/17/2001
Document Type
Agenda
Agenda Item
8h
Document Relationships
2001 S Solid Waste - Joyce Engineering, Inc Landfill Engineering Services Contract Addendum
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2001
Minutes - 04-17-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br />SITE INVESTIGATION AND MON(TORI1~'C WELL INSTALLATION FEES <br />The following char,es are assessed on a per ttnit basis for field activities not associated with <br />routine water sampling events. The cl~argcs arc for .replacement of expendable items, and for <br />upkeep, maintenance. and depreciation of field cools and instrumentation. <br />a. Disposable Bailer-Polyethylene <br />b. Disposable Boiler-Teflon <br />c_ Hand Augers <br />d. Electronic Water Level Meter <br />e. Organic Vapor !v].eter <br />f. Disposable Rubber Gloves-Light <br />g. Disposable Rubber Gloves-Heavy <br />h. Neeativt Pressure Organic vapor Respirator <br />i. Disposable Tyvek Suit <br />j. Do.~~nhole Pressure Transducer/Data Logger <br />k. Conductivity/Temperature/pH Meters <br />1. Disposable Bailer Gard <br />m. Camera Use <br />$ 20.00 each <br />$ 30.00 each <br />$ ] 5.00 per day <br />S 10.00 per day <br />$115.OD per day <br />$ _ 10 a pazr <br />$ 3.00 a pair <br />$ 15.00 per day <br />$ ]0.00 each <br />$ 50.00 per well <br />$ 10.00 per day <br />.OS per foot <br />$ 5.00 per day <br />February 3000 Q Boyce Engineering, Inc. <br />Professional Rate Schedule <br />
The URL can be used to link to this page
Your browser does not support the video tag.