Orange County NC Website
_ 72 <br />Photocoprv~. Photocopying includes the cost of copying documents internally. <br />Fio__I[ln~. Plotting includes the cost of producing CARD drawings on bond, vellum, and mylar. <br />Vehicle Charge. Vehicle charge includes the cost far mileage an employee vehicles and company <br />vehicles. <br />SUPPLEMENTAL E7iPElYSES (unit rates) <br />CADD <br />Combustible Gas Monitor <br />Combustible Gas Meter <br />Large Format Reproduction <br />photocopyin; <br />Plotting: <br />Bond <br />Vellum <br />Mylat <br />Vehicle Charge <br />$ 12.50 per hour <br />$ 60.00 per day <br />$ 9s_ao per day <br />$ .15 per square foot <br />$ .06 per copy <br />$ .65 per square foot <br />$ .85 per square foot <br />$ 1.00 per square foot <br />$ .35 per mile <br />WATER SAMPLING (in addition to labor and other expenses) <br />1. Sampling Crew Preparations. $100.00 per event <br />This includes coordination of and preparations far a sampling event. Including <br />crew lime spent on equipment maint~-Hance, bottleware and avoler preparations, and <br />restaelcing supplies. <br />?. Miscellaneous Supplies. <br />a. Groundwater Samples {using JEI bailer) $30,00 per well <br />b, Groundwater Samples (using dedicated bailer) $20,00 per well <br />c. Surface Water and Leacliate Samples $20.00 per point <br />The miscellaneous supplies fee for sampling includes payment for expendable <br />items such as rubber gloves, ice, bailer rope, and calibration solutions- This fee also <br />covers the upke;~p, maintenance, and depreciation of water level; pH, specific <br />conductivity. and temperature meters- The fee far use of a JL• I bailer i~icludes timC spent <br />on decontamination of the bailer and the expendable items associated with this <br />procedure. <br />February 2000 3 Joyce Engineering, Inc. <br />Professional Rate Schedule <br />