Browse
Search
2019-830-E IT - Intellicom Inc. 405 Meadowlands fiber construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-830-E IT - Intellicom Inc. 405 Meadowlands fiber construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2019 3:27:33 PM
Creation date
11/12/2019 2:27:48 PM
Metadata
Fields
Template:
Contract
Date
11/8/2019
Contract Starting Date
11/11/2019
Contract Ending Date
12/2/2019
Contract Document Type
Agreement - Construction
Amount
$14,314.00
Document Relationships
R 2019-830 IT - Intellicom Inc. 405 Meadowlands fiber construction
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Providing all of your communication needs including: VOICE * DATA * FIBER OPTICS * PUBLIC ADDRESS * SECURITY <br />Visit us on the Web @ www.intellicomusa.com <br />2902 S. Miami Blvd., Ste. C <br />Durham, NC 27703 <br />Office: 919.957.1949 <br />Fax: 919.957.8737 <br />November 7,2019 <br />TO: Froi Romero <br />OC <br />RE: Passmore / 405 Fiber <br />Scope: <br />Provide and install one six strand 62.5 OSP fiber from the Passmore Center to 405 Meadowlands. <br />Fiber will be installed in 1 ¼” HDPE innerduct between the buildings. <br />Install 1’’ Carlon innerduct in the ceilings of each building to the IDF’s. <br />The innerduct between the buildings will be installed by means of directional boring. Three small hand <br />holes will be installed as pull points. One at the base of each building and one in the middle on the <br />Passmore property. One inch PVC conduit and one 8’’x8’’ box will be installed up the back of each <br />building as an entry point. <br />Total Price: $14,314.00 <br />Conditions: <br />Price is valid for 30 days. <br />Conditions: <br />1. . This quote assumes that the areas of excavation are free of rock or other obstacles. <br />This contractor will make every reasonable effort to determine soil conditions prior to <br />the start of the project. Should rock or other obstacles be encountered, one of the <br />following can be implemented: <br />x A rock boring bit and/or air hammer will be used at an increase of cost per foot. <br />x excavation and removal would be handled on a time and materials basis based on <br />industry standard rates for an excavator, dump truck, jack hammer, or any other <br />equipment required. Dumping fees, if required, are also the responsibility of the <br />owner. <br />2. Location of all existing utilities is the responsibility of the owner. Should this contractor <br />be responsible for location other than the services of ULOCO or NC One Call, <br />additional charges would apply. If damage to utilities that have not been marked <br />occurs, repairs will be made in a timely manner to minimize downtime. This would be <br />performed on a time and materials basis. If damage occurs due to errors by this <br />contractor, we guarantee to have the utility restored within twenty-four (24) hours. <br />"UUBDINFOU408@1BTTNPSFUP.FBEPXMBOET'*#&3 <br />DocuSign Envelope ID: A93B09D9-2B11-40B7-930B-AE093756CE2A
The URL can be used to link to this page
Your browser does not support the video tag.