Orange County NC Website
DRAFT 4 <br />North Carolina Department of Transportation funds) from its own funding sources, bringing <br />the project total to $35,942,000. <br />Section 6. This ordinance replaces the interlocal agreement dated August 7, 2003 (with subsequent <br />Addendum A and Addendum B) as the controlling instrument regarding the High School #3 <br />project budget, scope, and timing. The following provisions of the previously existing <br />interlocal agreement and addenda remain expectations of the Orange County Board of <br />Commissioners regarding smart-growth promoting standards that the Chapel Hill-Carrboro <br />Board of Education will incorporate into the project scope, design, and plans: <br />L Transportation Standads, The building shall be located within'I/z mile of an existing or <br />planned trail, greenway, bikeway or bus line. The design of CHCCS high school #3 and its <br />facilities shall provide bike racks and storage for 10% of"the building occupants, provide <br />preferred parking for carpools and alternative vehicles and reduce pazking lot size and its <br />associated impervious surfaces by at least 35% from Orange County School Construction <br />Standaz~ds by providing no more than 420 spaces for Phase I and Phase II <br />student/teacher/staffl visitor motor vehicle parking, all to be constructed with Phase L <br />2. Site Standards. The design of"CHCCS high school #3 and its facilities shall (1) <br />preserve a minimum of" 30% of the site in undeveloped space; and (2) provide shade on at <br />least 30% of non-roof impervious surface on the site within 5 yeazs or use an open grid <br />pavement system, with less than 50% impervious surface, for 50% of the pazking area.. The <br />site shall comply with the Town of Carrboro's new stream protection plan and implement a <br />storm management plan that does not increase the rate or quality of runoff from the site. <br />3. Building Stazrdards. The building design shall stress compact design features including <br />multi-story construction. The physical education and athletic facilities shall be designed to <br />minimize land dishubance. <br />4. Water Use Standards. Design standazds shall have a goal of aggregate water reduction <br />of 20% of the base, not including irrigation, after meeting EPA 1992 fixture performance <br />requirements with respect to irrigation and reflect xeriscaping principles. <br />5. Shared Use Standads. Design standards shall provide the public with non-school hour <br />access to exterior spaces, including a vita track, cross country course designed and <br />maintained to increase environmental awareness and interior spaces for community use <br />including common areas, auditoria azrd meeting rooms. <br />6. CHCCS High Performance Standards. Design standards shall comply with the high <br />performance building design criteria in School Board Policy 9040. <br />7.. Public Road Improvement Standaz~ds. Endorse the timely construction of road <br />improvements to Smith Level Road and intersection improvements to the intersection of <br />Rock Haven Aoad and Smith Level Road which improvements have been endorsed by <br />Carrboro and Orange County and which improvements, if timely constructed, will reduce <br />by as much as $250,000 the offsite road improvement cost to CHCCS in its construction of <br />CHCCS high school #3 <br />