Browse
Search
Agenda - 06-07-2005-9b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 06-07-2005
>
Agenda - 06-07-2005-9b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:12:27 PM
Creation date
8/29/2008 10:30:49 AM
Metadata
Fields
Template:
BOCC
Date
6/7/2005
Document Type
Agenda
Agenda Item
9b
Document Relationships
Minutes - 20050607
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
ORD-2005-031 - CHCCS High School #3 Capital Project Ordinance
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT 4 <br />North Carolina Department of Transportation funds) from its own funding sources, bringing <br />the project total to $35,942,000. <br />Section 6. This ordinance replaces the interlocal agreement dated August 7, 2003 (with subsequent <br />Addendum A and Addendum B) as the controlling instrument regarding the High School #3 <br />project budget, scope, and timing. The following provisions of the previously existing <br />interlocal agreement and addenda remain expectations of the Orange County Board of <br />Commissioners regarding smart-growth promoting standards that the Chapel Hill-Carrboro <br />Board of Education will incorporate into the project scope, design, and plans: <br />L Transportation Standads, The building shall be located within'I/z mile of an existing or <br />planned trail, greenway, bikeway or bus line. The design of CHCCS high school #3 and its <br />facilities shall provide bike racks and storage for 10% of"the building occupants, provide <br />preferred parking for carpools and alternative vehicles and reduce pazking lot size and its <br />associated impervious surfaces by at least 35% from Orange County School Construction <br />Standaz~ds by providing no more than 420 spaces for Phase I and Phase II <br />student/teacher/staffl visitor motor vehicle parking, all to be constructed with Phase L <br />2. Site Standards. The design of"CHCCS high school #3 and its facilities shall (1) <br />preserve a minimum of" 30% of the site in undeveloped space; and (2) provide shade on at <br />least 30% of non-roof impervious surface on the site within 5 yeazs or use an open grid <br />pavement system, with less than 50% impervious surface, for 50% of the pazking area.. The <br />site shall comply with the Town of Carrboro's new stream protection plan and implement a <br />storm management plan that does not increase the rate or quality of runoff from the site. <br />3. Building Stazrdards. The building design shall stress compact design features including <br />multi-story construction. The physical education and athletic facilities shall be designed to <br />minimize land dishubance. <br />4. Water Use Standards. Design standazds shall have a goal of aggregate water reduction <br />of 20% of the base, not including irrigation, after meeting EPA 1992 fixture performance <br />requirements with respect to irrigation and reflect xeriscaping principles. <br />5. Shared Use Standads. Design standards shall provide the public with non-school hour <br />access to exterior spaces, including a vita track, cross country course designed and <br />maintained to increase environmental awareness and interior spaces for community use <br />including common areas, auditoria azrd meeting rooms. <br />6. CHCCS High Performance Standards. Design standards shall comply with the high <br />performance building design criteria in School Board Policy 9040. <br />7.. Public Road Improvement Standaz~ds. Endorse the timely construction of road <br />improvements to Smith Level Road and intersection improvements to the intersection of <br />Rock Haven Aoad and Smith Level Road which improvements have been endorsed by <br />Carrboro and Orange County and which improvements, if timely constructed, will reduce <br />by as much as $250,000 the offsite road improvement cost to CHCCS in its construction of <br />CHCCS high school #3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.