Browse
Search
Agenda - 04-17-2001-8g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 04-17-2001
>
Agenda - 04-17-2001-8g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:52:52 PM
Creation date
8/29/2008 10:30:48 AM
Metadata
Fields
Template:
BOCC
Date
4/17/2001
Document Type
Agenda
Agenda Item
8g
Document Relationships
2001 S Solid Waste - University Mall Recycling Drop-off Site Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2001
Minutes - 04-17-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
which result from these services unless such damage is caused by the County, its <br />agents or employees. <br />13. The Owner, using its on-site security personnel, shall use its best efforts to enforce <br />restrictions against illegal dumping at the site and assist the County, when possible, in <br />site cleanup as possible using its Mall maintenance personnel. <br />14. In consideration far use of the University Mall for recycling drop-off, the County <br />shall compensate the Owner for construction costs of $146,231.80 incurred to <br />develop the recycling site. The total value of construction shall be determined by the <br />Owner based on the actual casts they incur to construct the recycling site. These <br />costs shall include any landscaping and specific lighting costs incurred as a <br />consequence of the relocation of the recycling site. If the landscaping and lighting <br />was required, regardless of the presence of the recycling site, then the cost shall not <br />be included in the total referenced above. The following payment schedule is agreed: <br />a) a first yeaz payment of $8,000, and <br />b) annual payments thereafter of $9,873.70 <br />The annual fee shall be payable in January of each yeaz, with the last payment to be <br />made in January 2015. <br />15. This agreement is effective on the date first written above and will remain in effect, <br />unless cancelled by either party, until January 30, 2015. <br />16. This Agreement constitutes the entire Agreement of the parties hereto and shall be <br />amended only by written modification by both parties. <br />
The URL can be used to link to this page
Your browser does not support the video tag.