Browse
Search
2019-822-E AMS - Intellicom remediation data work for G12 Closet
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-822-E AMS - Intellicom remediation data work for G12 Closet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2019 3:12:15 PM
Creation date
11/8/2019 3:09:37 PM
Metadata
Fields
Template:
Contract
Date
11/5/2019
Contract Starting Date
11/5/2019
Contract Ending Date
6/30/2020
Contract Document Type
Agreement - Construction
Amount
$8,856.00
Document Relationships
R 2019-822 AMS Intellicom remediation data work for G12 Closet
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Providing all of your communication needs including: VOICE * DATA * FIBER OPTICS * PUBLIC ADDRESS * SECURITY <br />Visit us on the Web @ www.intellicomusa.com <br />2902 S. Miami Blvd., Ste. C <br />Durham, NC 27703 <br />Office: 919.957.1949 <br />Fax: 919.957.8737 <br />July 8, 2019 <br />TO: Angel Barnes <br />Orange County <br />RE: Sheriff Dept. <br />Data Closet Clean-up <br />Scope: <br />Phase 1: <br />Identify and label all data cabling and phone cabling. <br />Provide and install approximately (200) two-hundred 25’ cat 6 patch cables and (2) two duplex fiber <br />connections from the data closet over the wall to the file room for a temporary connection. Install a <br />sleeve in the ceiling to accommodate the cabling. Label all patch cables at both ends to insure proper <br />port connection. <br />This work to be completed during regular business hours. <br />Phase 2: <br />Remove all data jacks from patch panels and patch to temporary patch cables installed to file room. <br />Remove fiber from enclosure and patch to temporary fiber jumpers. <br />Remove analog phone cable from punch block and reconnect for temporary use. <br />Remove analog phone cables from patch panels and reconnect for temporary use. <br />Phase 3: <br />Provide new patch panels, horizontal wire managers and fiber enclosure to existing racks. <br />Re-install all data cabling, phone cabling and fiber to new panels. <br />Assist IT in re-patching all cabling to switches. <br />Phase 2 and 3 work to be performed during weekend hours. <br />DocuSign Envelope ID: 1E518343-2340-4E32-861F-970C50FD99F0
The URL can be used to link to this page
Your browser does not support the video tag.