Browse
Search
2019-819-E AMS - Sasser Companies G12 IT Closet remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-819-E AMS - Sasser Companies G12 IT Closet remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 2:56:26 PM
Creation date
11/8/2019 3:09:23 PM
Metadata
Fields
Template:
Contract
Date
11/5/2019
Contract Starting Date
11/5/2019
Contract Ending Date
6/30/2020
Contract Document Type
Agreement - Construction
Amount
$25,827.00
Document Relationships
R 2019-819 AMS - Sasser Companies G12 IT Closet remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />Sasser Companies - Remediation Division <br />ORANGE_CO_IT-MOLD 8/16/2019 Page: 2 <br /> ORANGE_CO_IT-MOLD <br />ORANGE_CO_IT-MOLD <br />DESCRIPTION QTY <br />1. Hazardous Waste/Mold Cleaning- Supervisory/Admin- after hr 16.00 HR <br />The above charge is to have a Certified Indoor Environmentalist on site during the project to oversee and assist with the mold <br />remediation. <br />2. Hazardous Waste/Mold Cleaning Technician - after hours 48.00 HR <br />The above charge is to have three (3) mold trained technicians on site for two (2) days to conduct the actual mold remediation. <br />3. Peel & seal zipper - heavy duty 1.00 EA <br />The above charge is for the heavy duty zipper to be placed and reinforced on the doorway to the IT closet. <br />4. Neg. air fan/Air scrub.-XLrg (per 24 hr period)-No monit. 8.00 DA <br />The above charge is for two (2) air scrubbers, one (1) within the containment and one (1) on the exterior in the event of an <br />accidental spore release. Air scrubbers are equipped with HEPA filtration devices that filter 99.97% of all particulate at 0.3 <br />microns. <br />5. Containment Barrier/Airlock/Decon. Chamber 100.00 SF <br />6 mil plastic for critical barriers, zipper door construction and to block out air intrusions. <br />6. Add for HEPA filter (for neg. air machine/vacuum - Large) 2.00 EA <br />The above charge is for the replacement of two (2) HEPA filters, ensuring the particulate remains below 99.97% efficient at <br />0.3 microns, and to prevent cross contamination. <br />7. Post Remediation Verification Testing 1.00 EA <br />The above charge is for the PRV conducted by the Environmental Solutions Group to ensure the space is remediated per the <br />standards of the American Society of Safe Engineers'. <br />8. Add for personal protective equipment - Heavy duty 12.00 EA <br />The above charge is for the suits worn by the three (3) workers, switching suits two (2) times each per day, for two days. <br />9. Respirator cartridge - HEPA & vapor & gas (per pair) 3.00 EA <br />The above charge is for the replacement of the HEPA respirator cartridges. <br />10. Add for HEPA filter (for canister/backpack vacuums) 1.00 EA <br />The above charge is for the replacement of the HEPA filter within the HEPA vacuum. <br />11. Sheathing - plywood - 3/4" - Fire Rated 192.00 SF <br />Replacement of the fire rated plywood sheathing around the perimeter of the room. <br />12. Drywall Repair - Labor and Material 1.00 EA <br />Replacement of drywall around the perimeter of the room. <br />13. Painting -Labor and Material 1.00 EA <br />Painting of the new drywall <br />14. Electrical 1.00 EA <br />Electrician to detach and reset electrical conduits and fixtures as required to perform the mold remediation <br />Mechanical <br />DESCRIPTION QTY <br />15. Heat, Vent, & Air Conditioning 1.00 EA <br />Provide & Install (1) 1 Ton ductless split system to serve Server Room G12. This unit replaces the existing 3-ton ductless split <br />system. Reconnecting to existing power wiring, refrigerant piping and controller. <br /> Provide engineered drawing for permitting and size selection verification. <br /> Provide Bacnet interface car for connection to building control system (by owner), start-up, required inspections and 1 year <br />general warranty. <br />DocuSign Envelope ID: 59750B8C-CBAD-417F-B81D-9DA30237AECD
The URL can be used to link to this page
Your browser does not support the video tag.