Browse
Search
2019-818-E AMS - Sasser 115 E King St interior PD upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-818-E AMS - Sasser 115 E King St interior PD upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 2:53:55 PM
Creation date
11/8/2019 3:09:19 PM
Metadata
Fields
Template:
Contract
Date
11/8/2019
Contract Starting Date
11/8/2019
Contract Ending Date
2/28/2020
Contract Document Type
Agreement - Construction
Amount
$35,580.00
Document Relationships
R 2019-818 AMS - Sasser 115 E King St interior PD upfit
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phone: (336)449-1144 PO Box 10, Whitsett NC 27377 Fax: (336)449-1151 <br /> www.SASSERCOMPANIES.com <br />Scope of Work <br /> <br />Demolition <br />x Demolition of closet area and enlargement <br />x Remove all debris from the site and dispose <br />x Final clean <br /> <br />Framing <br />x Install framing in two (2) new offices, New IT room, break area, new closet in front area. <br /> <br />Drywall <br />x Install sheetrock to framed opening <br />x Finish sheetrock to level 4 finish ready for paint <br /> <br />Finish Carpentry <br />x Cabinetry business desk in front <br />x Base board in new offices and new closets <br />x Plywood in IT room <br /> <br />Paint <br />x Paint new sheetrock at opening one coat primer, and two finish coats to match existing walls <br />x Paint new wood trim around same opening, one coat primer, two finish coats of paint to match <br />existing walls <br /> <br />Electrical <br />x Add two (2) light switches in the two (2) new offices with two (2) new receptacles <br />x Two (2) new quadplex outlets in IT room <br />x Five (5) additional receptacles at front work station and break area <br /> <br />HVAC <br />x Two (2) new supplies in the offices <br />x Wrap duct work from outside unit in storage closet <br />x Vent in door of IT room <br /> <br />Final Clean <br />x Clean area of construction to same as before condition <br />x Remove any and all construction debris from the site <br /> <br />If you have any questions or need additional information, please feel free to contact me 336-449-1144 or <br />336-260-7824. <br /> <br />Sincerely, <br />Sasser Companies, Inc. <br /> <br />Angelo Bartis <br /> <br />Angelo Bartis <br />Project Manager <br />(M) 336-260-7824 <br />(O) 336-449-1144 <br />(E) angelo@sassercompanies.com <br />DocuSign Envelope ID: F0A74029-17CA-458B-AD90-04CD91C1D327
The URL can be used to link to this page
Your browser does not support the video tag.