Browse
Search
OUTBoard agenda 101619
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2019
>
OUTBoard agenda 101619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 10:07:21 AM
Creation date
11/4/2019 9:45:29 AM
Metadata
Fields
Template:
BOCC
Date
10/16/2019
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 <br /> o Proposed cross sections for both projects were also presented. <br /> • March 11, 2019, — Hillsborough Board of Commissioners recommended the No <br /> Build Alternative for Orange Grove Road extension. <br /> • July 30, 2019, — NCDOT local officials meeting, four alternatives were <br /> recommended for South Churton Street widening, extending the project to US- <br /> 70A intersection. <br /> 0 1 st— no bridge replacement, improve intersection. <br /> 0 2nd — bridge replacement and intersection improvements, no bike/ped. <br /> 0 3rd — bridge replacement and intersection improvements, with bike/ped. <br /> 0 4t" — bridge replacement and intersection improvements, with multi-use path. <br /> o All four recommend a multi-use path on the east and a sidewalk on the west. <br /> • The multi-use path and sidewalk are subject to NCDOT's current cost <br /> share policy. <br /> • August 2019, — Hillsborough Board of Commissioners decided the Town does <br /> want improvements at the US-70A intersection but does not want the railroad <br /> bridge replaced. <br /> o Due to traffic volume and adequate bridge condition, DOT does not require <br /> the bridge over railroad tracks to be replaced. <br /> o As a separate matter, the railroad bridge will be under review as multiple <br /> tracks are considered in the corridor. <br /> o Should the Town want the railroad bridge replaced, DOT will require the Town <br /> to pay for it. <br /> Transportation Planning staff will continue to keep the OUTBoard apprised of these <br /> corridors. Feel free to contact staff with any questions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.