Browse
Search
OUTBoard agenda 101619
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2019
>
OUTBoard agenda 101619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 10:07:21 AM
Creation date
11/4/2019 9:45:29 AM
Metadata
Fields
Template:
BOCC
Date
10/16/2019
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
66 <br /> 5 Policy References <br /> 5.1 Eliminated Polices <br /> The following policy documents are superseded by the Complete Streets Policy(2019): <br /> • Complete Streets Policy(2009) and Complete Streets Planning and Design Guidelines (2012) <br /> • Bicycle Policy(2009, update) <br /> • Pedestrian Policy Guidelines (2001) <br /> • Administrative Action to Include Local Adopted Greenway Plans in the NCDOT Highway Planning <br /> Process (1994) <br /> 5.2 Related Policies <br /> The following policy documents include elements related to Complete Streets implementation: <br /> • Traditional Neighborhood Development Manual(2000) <br /> • Bridge Policy(2000) <br /> • Policy on Street and Driveway Access to North Carolina Highways (2003) <br /> • Exceptions to Maintenance Responsibilities on State Highway System Streets in Municipalities <br /> (2003) <br /> • Subdivision Roads:Minimum Construction Standards (2010, updated May 2016) <br /> • Guidelines for Inclusion of Greenway Accommodation Underneath a Bridge as Part of a NCDOT <br /> Project(2015) <br /> 6 Cost Share <br /> 6.1 Complete Street Cost Share <br /> The table below illustrates the funding responsibilities for Complete Streets incorporating bicycle and <br /> pedestrian and roadway public transportation facilities. <br /> Complete Street Cost Share <br /> Facility Type In Plan Not in Plan, but Need Betterment <br /> Identified <br /> Pedestrian Facility NCDOT pays full Cost Share Local <br /> Bicycle Facility NCDOT pays full NCDOT pays full Local <br /> Side Path NCDOT pays full Cost Share Local <br /> Greenway Crossing NCDOT pays full Cost Share Local <br /> Bus Pull Out NCDOT pays full Cost Share Local <br /> Bus Stop (pad only) NCDOT pays full Cost Share Local <br /> Bicycle and pedestrian and public transportation facilities that appear in a state, regional or locally <br /> adopted transportation plan will be included as part of the proposed roadway project. NCDOT will fully <br /> fund the cost of designing, acquiring right of way, and constructing the identified facilities. <br /> Bridges will not be included in the total project construction cost for cost-sharing purposes. NCDOT is <br /> responsible for the full cost of bridges. <br />
The URL can be used to link to this page
Your browser does not support the video tag.