Browse
Search
OUTBoard agenda 101619
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2019
>
OUTBoard agenda 101619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 10:07:21 AM
Creation date
11/4/2019 9:45:29 AM
Metadata
Fields
Template:
BOCC
Date
10/16/2019
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
65 <br /> • purpose and need of the proposed facilities <br /> • current or anticipated land use context of the project area <br /> • traffic count data <br /> • design speed <br /> • crash history <br /> • topographic and geometric features of the roadway <br /> • safety <br /> Project Managers will consult with the Complete Streets Program Administrator to request evaluation of <br /> an alternative facility.The decision of the Complete Streets Review Team will be documented in the <br /> Complete Streets Project Sheet. <br /> 3 Resurfacing and Maintenance Activities <br /> 3.1 Scheduled Resurfacing <br /> Each year, a county-level resurfacing schedule is developed within each NCDOT Division. NCDOT Division <br /> staff will meet with local agencies to review the scheduled roadways and identify locations to evaluate <br /> Complete Streets improvements.These may include striping, markings and associated signage. <br /> The following process shall be followed to review resurfacing projects for complete street <br /> improvements: <br /> • The Operations Program Management Unit will coordinate with the Integrated Mobility Division <br /> to identify planned facilities within the project limits suitable for implementation in conjunction <br /> with maintenance activities. <br /> • Identified locations for Complete Streets improvements will be noted on the resurfacing list <br /> distributed to each unit of local government. <br /> • The local government concurrence with recommended Complete Streets improvements will be <br /> provided to the local NCDOT Division in writing. <br /> • Completed improvements will be incorporated into the Pedestrian and Bicycle Infrastructure <br /> Network (PBIN) and ATLAS upon completion. <br /> 3.2 Addition of Rumble Strips <br /> Rumble strips (raised traffic bars), asphalt concrete dikes, reflectors, and other such surface <br /> alterations, where installed on roadways without full access control, will be placed in a manner as <br /> not to present hazards to bicyclists or interfere with existing on-road bicycle facilities. Rumble strips <br /> shall not be extended across the shoulder of the roadway or other areas intended for bicycle travel. <br /> 4 Work Zone Accommodations <br /> The continuity of existing bicycle and pedestrian facilities will be maintained during construction and <br /> maintenance activities. During the construction phase of a roadway project, NCDOT's Guidelines for the <br /> Level of Pedestrian Accommodation in Work Zones will be followed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.