Browse
Search
OUTBoard agenda 101619
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2019
>
OUTBoard agenda 101619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 10:07:21 AM
Creation date
11/4/2019 9:45:29 AM
Metadata
Fields
Template:
BOCC
Date
10/16/2019
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO- UNDER DEVELOPMENT <br /> TIP/WBS# Description Let/Start CompletionDate Date Cost Status Project Lead <br /> SS-4907CD Horizontal curve improvements on SR 1710(Old NC 10) 12/5/2019 Spring 2020 $261,000 Planning and design activities underway, Chad Reimakoski <br /> 47936.1.1 west of SR 1561/SR 1709(Lawrence Road)east of ROW activities June/July 2019 <br /> 47936.2.1 Hillsborough. Improvements consist of wedging pavement <br /> 47936.3.1 and grading shoulders. <br /> W-5707C Revise pavement markings and overhead lane use signs for 12/19/2019 Apr.2020 $395,000 No bids on most recent letting, Project on Chad Reimakoski <br /> 44853.1.3 removal of inside lane drop configuration on 140 Westbound hold until further notice <br /> 44853.3.3 in vicinity of US 15-501 interchange. Resurfacing 1-40 WB <br /> 47490 by use of contingency funds <br /> 1-3306A Widening 1-40 from 1-85 in Orange Co.to Durham Co.line TBD TBD $88,100,000 Planning and design activities underway, Laura Sutton <br /> 34178.1.3 (US 15/501 Interchange) Public meeting 1/24/19,No schedule at this <br /> 34718.2.2 time other than CE document scheduled for <br /> 34178.3.3 3/29/19,Combined w/1-3306AC <br /> P-5701 Construct Platform,Passenger Rail Station Building at 6/30/2021 FY2022 $7,200,000 PE funding scheduled 7/1/2020,Coordinate Matthew Simmons <br /> 46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough with U-5848 <br /> 46395.3.1 <br /> 1-3306AC Interchange improvements at 1-40 and NC86 in Chapel Hill 10/19/2021 FY 2023 $16,500,000 Planning and Design activities underway, Laura Sutton <br /> 34178.1.6 Combined w/1-3306A <br /> 34178.2.5 <br /> 434178.3.9 <br /> R-5821A Construct operational improvements including 6/21/2022 FY2024 $3,924,000 Planning and design activities underway, Chris Smitherman <br /> 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR coordinating with NC54 West Corridor Study <br /> 47093.2.2 1006(Orange Grove Road)to SR 1107/SR 1937(Old <br /> 47093.3.2 Fayetteville Road). <br /> U-5848 Extend SR 1006(Orange Grove Road)on new location with 3/21/2023 FY 2025 $5,326,000 Planning and Design activities underway, Laura Sutton <br /> 50237.1.1 Sidewalks and bike lanes from existing SR 1006(Orange Coordinate with P-5701 and U-5845 <br /> 50237.2.1 Grove Road)to US 70 Business in Hillsborough. <br /> 50237.3.1 <br /> Page 2 DCHCMPO Jul.2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.