Browse
Search
OUTBoard agenda 101619
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2019
>
OUTBoard agenda 101619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 10:07:21 AM
Creation date
11/4/2019 9:45:29 AM
Metadata
Fields
Template:
BOCC
Date
10/16/2019
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item 5.b <br /> NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO- UNDER DEVELOPMENT <br /> TIP/WBS# Description Let/Start CompletionDate Date Cost Status Project Lead <br /> SS-4907BS Installation of traffic signal at the intersection of US70 and 5/31/2017 Jul.2019 $40,500 R/W Construction underway,Tentatively schedule Dawn McPherson <br /> 44894.2.1 SR 1114(Buckhorn Road)East of Mebane. $43,200 CON to flash signal 6114/19 <br /> 44894.3.1 <br /> 47798 Increase length of existing turn lane/slip ramp and improve 1/17/2019 Jul.2019 $189,000 Construction underway-90%complete,final Derek Dixon <br /> existing radius in the SE quadrant of US 70 Business/NC 86 pavment markings pending <br /> at US 70 Bypass in Hillsborough <br /> U-5846 Construct a roundabout at SR 1772(Greensboro Street)and 5/2/2019 3/1/2022 $3,375,611 Project let and contract awarded to Fred Chad Reimakoski <br /> 50236.1.1 SR 1780(Estes Drive)in Carrboro. Smith Company <br /> 50236.2.1 <br /> 50236.3.1 <br /> B-4962 Replace Bridge#46 over Eno river on US 70 Bypass 4/16/2019 12/28/2021 $4,863,757 Project let and contract awarded to Conti Kevin Fischer <br /> 40174.1.1 Enterprises,Inc. <br /> 40174.2.1 <br /> 40174.3.1 <br /> W-5707K Remove and replace existing curb&gutter and sidewalk, 5/31/2019 Sept.2019 $350,000 ROW acquisition underway,construction Chris Smitherman <br /> 48283 add pedestrian signals,concrete island,and signal underway in areas of existing ROW Derek Dixon <br /> modifications on SR 1010(E.Main St/W.Franklin St)from <br /> Brewer Ln to Graham St.in Chapel Hill and Carrboro <br /> U-5847 Intersection improvements at SR 1010(West Franklin St.) 5/31/2019 Sept.2019 $775,000 Planning and design activities underway, Chris Smitherman <br /> 50238.1.1 and SR 1771 (Merritt Mill Rd)/SR1927(Brewer Lane)in bike/ped improvements to be completed <br /> 50238.2.1 Chapel Hill/Carrboro. under project 48283 <br /> 50238.3.1 <br /> Page 1 DCHCMPO Jul.2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.